Laserfiche WebLink
program is in full compliance with 29 CFR, Part 1910, including the OSHA interim"ruling which amends <br /> CERCLA and sets specific standards for medical surveillance and training.... Copies of training <br /> E. <br /> documentation are available on request by notifying Mr. John Lynch in our Tracy office at (209) 833- <br /> 0758. <br /> Wright field personnel have extensive knowledge of various construction work and the tools in which to <br /> do their work. <br /> f <br /> This formal training is supplemented by daily tail-gate safety briefing and additional site specific training. <br /> as required. <br /> 12.2 TAILGATE SAFETY MEETINGS <br /> Short job site Tailgate Safety Meetings will be.conducted at the beginning of each shift for each job or more <br /> frequently if new employees arrive at the job site. All workers and supervisors will be expected to attend. <br /> Health and safety concerned pertaining to the operations planned for that day will'be discussed. The meetings <br /> will also include any procedures that may be necessary for safety, or other considerations as determined the <br /> the Site Safety Officer, such as change in temperature, wind velocity, or precipitation. Attendance and j <br /> participation records will be retained, and will become part of the project file. <br /> I <br /> i <br /> i <br />} I <br /> a <br /> f 'R <br /> 7 ' <br />