S.lCDEH (oontinued) <br /> Pending the receipt of confirmation sampling results, Wright may recommend <br /> orie direct push boring to the groundwater table at approximately 35' following <br /> site restoration to confirm that no detectable levels have Infiltrated Into the <br /> groundwater table. <br /> This additional excavation aome of which has already been completed during <br /> retrofit work will take approximately 1 to 2.additions I workdays. <br /> t A report of the excavation including the quare ty of soil, chemical analysis, mass <br /> balance calculations sampling map and chain-o custody forms and narrative of <br /> mmiovM will be prepared after ail field work Is completed as pmvkied for In the <br /> spproved work plan, <br /> If you have any question®, please call <br /> Sincerely, <br /> Wrf ht Envm-- Mal Services, Inc. <br /> r : L <br /> Richard ickersvn Christopher M. Palmer r�p <br /> Oper►atlo Manager C.E.G. t2 ; H.G. 24t3 �o SER M p��o <br /> Cc: Mr. James Barton, RWQCB, Region 5 CL- N° 7262 <br /> CF.RTIEfED . <br /> ENGINE'ERI`;G <br /> GEOLOMT <br /> Pale 3 <br /> N <br />