Laserfiche WebLink
French Camp RV Park and Golf Course 2 16 July 2014 <br /> San Joaquin County <br /> 2. A revised 4th Quarter 2013 Monitoring Report that contains the required annual report <br /> monitoring data; <br /> 3. Certification that the concrete surface completion on monitoring well MW-2 has been <br /> repaired; <br /> 4. Certification that the sludge drying bed liners have been repaired; and <br /> 5. A statement describing how Canada Cove LLP will ensure that future monitoring reports <br /> are submitted on time and contain all required information. <br /> Additionally, in accordance with Quarterly Monitoring Report Requirement A. 4 of MRP <br /> R5-2010-R50651, staff requests that all future monitoring reports contain copies of the <br /> laboratory analytical reports. <br /> If you have any questions, please contact Brendan Kenny at (916) 464-4635. <br /> � <br /> o �� <br /> Senior Engineering Geologist <br /> WDR Compliance and Enforcement Section <br /> Enclosures: Photographic log <br /> Notice of Applicability and Monitoring and Reporting Program 97-10-DWQ-R5061 <br /> cc: San Joaquin Environmental Health Department, Stockton <br /> Inspection#16305454,Violation#'s972308, 972309 <br />