Laserfiche WebLink
5.0 WELL SURVEY <br /> The elevation of the top of the interior well casing (north side) will be determined by a licensed <br /> land surveyor. The elevation reference point at each monitoring well will be measured within <br /> 0.01 foot. This elevation will be the basis for determining the depth to groundwater. The <br /> surveyor will also determine the UTM or State Plane coordinates of the well (i.e.,northings and <br /> castings). <br /> 6.0 SCHEDULE FOR COMPLETION OF WORK <br /> The following schedule is assumed for construction of the monitoring wells: <br /> Action Action Target <br /> Duration Completion Date <br /> Submit Workplan to Regional Board 15 September 2006 <br /> Regional Board Approval of Workplan 4 weeks 13 October 2006 <br /> Retention of Drilling Contractor and Geologist and 4 weeks 10 November 2006 <br /> Coordination of Permits and Utility Clearances <br /> Monitoring Well Installation and Development and 4 weeks 8 December 2006 <br /> Groundwater Sample Collection <br /> Submit Report of Results to Regional Board 4 weeks 5 January 2006 <br /> French Camp-Monitoring Well Installation Workplan 7 SAB027100 <br /> September 2006 CADocuments and Settings\mlagorio\Local SettingsUemporary Internet Files\0LK9F\W0rk Plan <br />