Laserfiche WebLink
Heinz Seed Operations <br /> t: <br /> t <br /> F' <br /> ' 1 <br /> The day tank for 3% Muriatic Acid is drained daily and no 3% Muriatic Acid <br /> solution is allowed to remain in the day tank. Transfer of 3% Muriatic Acid from <br /> the day tank into the Hazardous Waste tank is done through pneumatic transfer. <br /> The pump for the Hazardous Waste day tank is closed and only opened when <br /> the transfer occurs allowing all of the 3% Muriatic Acid in the day tank to be <br /> transferred into the stationary Hazardous Waste tank. <br /> Figure 2 - Transfer pump for 3% Muriatic Acid <br /> Ja <br /> Gary Reeves, LLC <br /> �t Pra esstaria r"�aniza� _ , <br />