Laserfiche WebLink
RPR 20 '94 03:51PM OCDEI•J PROJECTS ENVIRONMENTAL DPT P.7/10 <br /> geotextile fabric for additional sediment filtering ability. <br /> 3. 'The well will be screened a minimum of ten (10) feet below the groundwater <br /> surface. if an apparent aquitard is encountered, the well will be terminated 1 to <br /> 2 feet into the aquitard. Efforts will be made not to screen across two aquifers. <br /> If confined aquifer conditions or high vadose zone contamination are <br /> encountered,the well screen will not be set above the depth of first encountered <br /> groundwater. <br /> 4 The well will be screened from the bottom of the well to a depth of <br /> approximately five (5) to ten (10) feet above the groundwater surface to <br /> accommodate future fluctuations in ground water elevation and to permit <br /> installation of sufficient sanitary and surface seal to prevent surface water <br /> infiltration. <br /> 5. The PVC pipe and end cap will be, steam cleaned prior to installation. <br /> 6. The filter media used to pack the annulus adjacent to the well screen will be <br /> selected so as to be able to adequately filter out sediment after sufficient well <br /> development has occurred. The annular space between the screen and the wall <br /> of the boring will be backfilled with the appropriate clean Ione Star Industries <br /> 0130 or 2/12 Monterey sand to approximately 2 feet above the top of the <br /> perforated sections. The well screen will also be wrapped in geotextile to <br /> provide additional filtering. Based on soil logs or a sieve test, modifications may <br /> be made regarding the size of sand to be used. Installation of the 0/30 sand may <br /> require that the sand be tremmied, using clean water- In this event, a sample of <br /> the tremie water will be collected, unless the source is thought to be clean_ <br /> 7. A 3- to 5-foot bentonite plug will be placed above the sand pack to provide an <br /> annular seal against surface waxer infiltration and to reduce the potential for <br /> cement grout to infiltrate into the water. <br /> 8. The remaining annular space will be filled to the surface with tremmied <br /> cementlbentonite grout (surface seal) to the surface. <br /> 9. The well will be secured in a below-ground locking stovepipe and the well head <br /> enclosed in a water-tight utility box set flush to the ground surface. <br /> Mom—ftoring,Well Development <br /> The new well will be developed to reduce the effects of drilling on the formation and to <br /> increase the effective hydraulic radius of the well. The monitoring well will be developed <br /> 24 to 48 hours after its installation to allow the grout to set Additionally, the existing wells <br /> may be redeveloped az necessary. <br /> 2 <br />