MONITORING AND REPORTING PROGRAM ORDER NO. RS-2008-0149-010
<br /> BARNES TRUCKING FACILITY
<br /> SAN JOAQUIN COUNTY
<br /> Table 1 : Sampling Frequency and Constituent Suite
<br /> Sample Time and Sample Type/Locationt Constituent Suite(s) Monitoring Objective
<br /> Fre uenc 2
<br /> Before Injection Upgradient, shallow, MW-2 TPH- , EROs, CAM 17 Background'
<br /> Injection, shallow, IW-9 TPH- , EROs, CAM 17 Treatment Zones
<br /> Injection, deep, AS-1 TPH- , EROs, CAM 17 Treatment Zone
<br /> Transition, shallow, IW-2 TPH- , EROs, CAM 17 Transition Zone
<br /> Transition, deep, MW-10 TPH-g, EROS CAM 17 Transition Zone
<br /> Compliance, shallow, MW-7 TPH-g, EROS, CAM 17 Compliance'
<br /> Compliance, dee MW-12 TPH- , EROs, CAM 17 Co fiance
<br /> During Injection U radient, shallow, MW-2 TPH- , EROs, CAM 17 Bac ound
<br /> Injection, shallow, IW-9 TPH- , EROs, CAM 17 Treatment Zone
<br /> Injection, deep, AS-1 TPH- , EROs, CAM 17 Treatment Zone
<br /> Transition, shallow, IW-2 TPH- , EROs, CAM 17 Transition Zone
<br /> Transition, deep, MW- 10 TPH- , EROs, CAM 17 Transition Zone
<br /> Compliance, shallow, MW-7 TPH- , EROs, CAM 17 Compliance
<br /> Compliance, dee MW-12 TPH- , EROs, CAM 17 Com liance
<br /> Field ScreeningAs needed TPH- , EROs, CAM 17 Treatment Zones
<br /> After Injection Upgradient, shallow, MW-2 TPH- , EROs, CAM 17 Background'
<br /> Injection, shallow, IW-9 TPH- , EROs, CAM 17 Treatment Zones
<br /> hfection, deep, AS-1 TPH- , EROs, CAM 17 Treatment Zone
<br /> Transition, shallow, IW-2 TPH- , EROs, CAM 17 Transition Zone
<br /> Transition, deep, MW-10 TPH-g, EROs, CAM 17 Transition Zone°
<br /> Compliance, shallow, MW-7 TPH-g, EROS, CAM 17 Com liance
<br /> Compliance, dee MW-12 TPH-g, EROS, CAM 17 Com liance
<br /> Pre-injection Tap water for mixing TPH-g, ERGs, CAM 17 Background
<br /> Post Dewatering Discharge Influent TPH-g, EROS, CAM 17 Discharge
<br /> Requirements
<br /> Baker Tank 1 TPH-g, EROS, CAM 17 Discharge
<br /> Requirements
<br /> First Discharge Between Carbons TPH-g, EROS, CAM 17 Discharge
<br /> Requirements
<br /> Pre-discharge Baker Tank 2 - discharge TPH-g, EROS, CAM 17 Discharge
<br /> Re uirements
<br /> Semi-annual MW-7, 8 (shallow) TPH-g, EROS, CAM 17 Compliance
<br /> MW-12, 13 dee
<br /> Monthly MW-1 and MW-6, TPH-g, SROs, CAM 17 Treatment Zone
<br /> IWA through 12 (shallow)
<br /> and AS-1/DPW- I/MW-5B
<br /> (deep)
<br /> Month MW-9, MW-10, and TPH-g, EROS, CAM 17 Transition Zone
<br /> MW-11 (deep) and
<br /> IW-1, IW-2, and IW-12 shallow
<br /> Semi-annual" MW-2 through MW-4 TPH-g, EROS, CAM 17 Back round
<br /> Well numbers as shown on Figures 2 through 7.
<br /> 'i.e., weekly, monthly, quarterly, annually, other.
<br /> 'Constituent suite components listed in Table 2.
<br /> 'Wells used to determine compliance with water groundwater limitations.
<br /> 'Wells sampled to evaluate in-situ progress inside the treatment zone.
<br /> 'Wells sampled to evaluate migration of pollutants within the treatment zone.
<br /> 'Wells used to develop background concentrations.
<br /> Page 5 of 8
<br />
|