My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002456
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:52:43 PM
Creation date
1/15/2020 2:50:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002456
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ay el <br /> CLEARWATER <br /> G R O U P <br /> Envrronmrntaf Srrvrcrs <br /> GROUNDWATER MONITORING AND SAMPLING RESULTS <br /> Depth to groundwater 12 08 (MW-8) to 10 65 (MW-2) feet below top of casing <br /> FIow direction and gradient Southeast at 0 0025 ft/ft <br /> TPHg concentration range < 50 gg/L (MW-2,MW-4) to 12,000 4g/L (MW-1) <br /> Benzene concentration range <0 50 gg/L (MW-2, MW-3,MW-4) to 640 Ag/L (MW-55) <br /> MTBE concentration range Below detectable limits for all monitoring wells <br /> PROJECT STATUS & RECOMMENDATIONS <br /> The contaminant plume is currently delineated and being monitored on a quarterly basis <br /> The Workplan for Remedial Feasibility Testing dated August 17, 2001 was approved by the San Joaquin <br /> County Public Health Services in a letter dated September 12, 2001 Since then, Clearwater prepared <br /> and subrrutted costs for pre-approval for remedial feasibility testing and quarterly groundwater <br /> monitoring through the 2nd quarter 2002 Drilling and installation of a dual-phase test well and a i r <br /> isparge point at the site is tentatively scheduled for the week of December 17, 2001 <br /> ZB178C-4QT01 4 November 1, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.