Laserfiche WebLink
CLEARWATER GROUP, INC <br /> • Soil Borehole Drilling, Monitoring Well Installation and Development, <br /> and Groundwater Sampling Field Procedures <br /> Drilling and Soil Sampling <br /> Permits, Site Safety Plan. Utility Clearance <br /> Clearwater Group, Inc (CGI) obtains all the required permits,unless otherwise contractually directed CGI prepares <br /> a site specific Site Safety Plan detailing site hazards, site safety and control, decontamination procedures, and <br /> emergency response procedures to be employed throughout the defined phase of work At least 48 hours prior to <br /> drilling,Underground Service Alert(USA)or an equivalent agency is notified of the planned work CGI, attempts to <br /> locate all underground and above ground utilities by site inspection (in conjunction with its' subcontractors and <br /> knowledgeable site managers, if available), and review of site as-built drawings CGI may employ a private, <br /> professional utility locator to refine the site utility inspection <br /> Drilling Eq_uinment <br /> All soil borings are drilled using a truck-mounted hollow-stem auger drill rig, unless site conditions warrant a <br /> different drilling method Subsurface conditions permitting, the first five feet of each boring is advanced using a <br /> hand-auger or post-hole digger All drilling equipment is inspected daily and maintained in safe working condition <br /> by the operator All down-hole drilling equipment is steam cleaned prior to arriving on site Working components <br /> of the drill ng near the borehole, as well as augers and drill rods are thoroughly steam cleaned between each boring <br /> location All CGI drilling and sampling methods are consistent with ASTM Method D-1452-80, and local, state and <br /> federal regulations <br /> Soil Sampling and Lithologic Description <br /> Whenever possible, the first Clearwater boring to be drilled at a site is continuously cored to obtain a complete <br /> lithologic description Otherwise, soil samples are typically collected every 5 feet to the total depth explored, using <br /> . brass tubes fitted in a California-modified split spoon sampler If copper or zinc contamination is the subject of the <br /> investigation stainless steel liners are used instead of brass Additional soil samples may be collected based upon <br /> significant changes in lithology or in areas of obvious soil containination During soil sample collection, the split <br /> spoon sampler is driven 18 to 24 inches past the lead auger by a 140-pound hammer falling a minimum of 30 <br /> inches The number of blows necessary to drive the sampler and the amount of soil recovered is recorded on the <br /> Field Exploratory Soil Boring Log The soil sampler and liners are cleaned with an Alconox® solution and rinsed <br /> with tap water prior to each sampling event New liners are used whenever a soil sample may be retained for <br /> laboratory analysis <br /> Soil samples selected for laboratory analysis are sealed on both ends with teflon tape and plastic end caps The <br /> samples are labeled, documented on a chain-of-custody form and placed in a cooler for transport to a state certified <br /> analytical laboratory Soil contained in remaining liners is removed for lithologic descriptions (according to the <br /> Unified Soil Classification System) Additional soil is screened for organic vapors by placing approximately 30 <br /> grams of soil in a sealed plastic bag or a glass jar sealed with aluminum foil The bag or,lar is left undisturbed for <br /> approximately 15 minutes, in the sun if possible The head space in the bag is accessed in a manner to minimize <br /> entry of outside air,and is tested for total organic vapor using a calibrated organic vapor meter (OVM) The results <br /> of the field screening are noted with the lithologic descriptions on the Field Exploratory Soil Boring Log <br /> On encountering an impermeable (clayey) layer three feet or more in thickness below a saturated permeable layer, <br /> where the impermeable layer is considered to be a possible confining Iayer for an underlying aquifer,drilling is halted <br /> until a decision to proceed is obtained from the project manager This process minimizes the chance of introducing <br /> contamination to an underlying,clean aquifer <br /> Soil Waste Managtnent <br /> Soil cuttings are stockpiled on and covered with plastic sheeung to control runoff, or contained in 55-gallon D O T- <br /> approved drums on site Waste soil is sampled to chemically profile it for disposable,and hauled by a licensed waste <br /> hauler to an appropriate landfill All waste stored on site is properly labeled at the time of production <br /> CLEe1RWATER GROUP,INc (WI/GWS) 1 revised March 23,2000 <br />