My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002474
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:36:59 PM
Creation date
1/15/2020 2:58:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002474
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEAR-WATER <br /> K O U P 1 N C <br /> Ent,onw,nh.f S,,r— <br />' be recorded on the boring log All soil sampling equipment will be <br /> decontaminated between sampling events to avoid cross-contamination <br />' Soil removed from the top two brass liners will be used to describe the soil (in <br /> accordance with the Unified Soil Classification System) and to screen the soil <br /> for organic vapors The field screening equipment used should be a flame <br />' ionization detector (FID) Results of the field screening for organic vapors <br /> will be recorded on the field log <br />' Soil from the third brass liner will be sealed at both ends with Teflon sheets <br /> and plastic end caps If selected for laboratory analysis, the sample tubes will <br />' be labeled, documented on a chain-of-custody form, and placed in a cooler for <br /> transport to a state-certified analytical laboratory <br /> Monitoring Well Construction <br /> Depth to groundwater is unknown because there are currently no monitoring <br /> wells at the site For the purpose of this workplan, groundwater is assumed <br /> to be present at a depth of approximately 20 feet bgs The monitoring wells at <br /> the subject location should be constructed with 20 feet of screen so that the <br /> screen extends 10 feet below first encountered groundwater and 10 feet above <br /> first encountered groundwater <br /> rOther well construction specifications are shown on Figure 3 and are <br /> summarized below <br />' • Total depth of each monitoring well will be 10 feet below the depth to <br /> groundwater (as encountered during drilling) <br />' 0 Wells will be constructed of 2-inch-diameter Schedule 40 PVC casing and <br /> slotted screen <br /> I • Twenty feet of screen (0 010-inch slot size) will be placed in each well <br /> • A sand filter pack consisting of No 2/12 sand will be placed in the well <br /> annulus from total depth to two feet above the top of the screened interval <br /> • A bentonite seal two feet thick will be placed over the filter pack (the seal <br /> will be made by hydrating bentonite pellets) J <br /> I <br /> • <br /> 1 <br />' C-178 WP 4117 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.