Laserfiche WebLink
CLEAR-WATER <br /> K O U P 1 N C <br /> Ent,onw,nh.f S,,r— <br />' be recorded on the boring log All soil sampling equipment will be <br /> decontaminated between sampling events to avoid cross-contamination <br />' Soil removed from the top two brass liners will be used to describe the soil (in <br /> accordance with the Unified Soil Classification System) and to screen the soil <br /> for organic vapors The field screening equipment used should be a flame <br />' ionization detector (FID) Results of the field screening for organic vapors <br /> will be recorded on the field log <br />' Soil from the third brass liner will be sealed at both ends with Teflon sheets <br /> and plastic end caps If selected for laboratory analysis, the sample tubes will <br />' be labeled, documented on a chain-of-custody form, and placed in a cooler for <br /> transport to a state-certified analytical laboratory <br /> Monitoring Well Construction <br /> Depth to groundwater is unknown because there are currently no monitoring <br /> wells at the site For the purpose of this workplan, groundwater is assumed <br /> to be present at a depth of approximately 20 feet bgs The monitoring wells at <br /> the subject location should be constructed with 20 feet of screen so that the <br /> screen extends 10 feet below first encountered groundwater and 10 feet above <br /> first encountered groundwater <br /> rOther well construction specifications are shown on Figure 3 and are <br /> summarized below <br />' • Total depth of each monitoring well will be 10 feet below the depth to <br /> groundwater (as encountered during drilling) <br />' 0 Wells will be constructed of 2-inch-diameter Schedule 40 PVC casing and <br /> slotted screen <br /> I • Twenty feet of screen (0 010-inch slot size) will be placed in each well <br /> • A sand filter pack consisting of No 2/12 sand will be placed in the well <br /> annulus from total depth to two feet above the top of the screened interval <br /> • A bentonite seal two feet thick will be placed over the filter pack (the seal <br /> will be made by hydrating bentonite pellets) J <br /> I <br /> • <br /> 1 <br />' C-178 WP 4117 4 <br />