Laserfiche WebLink
CLEARwi�'_T_ER <br /> Eiie""'.m,ntoI Seri leas <br />' 2.5 Chemical Analyses of Groundwater Samples <br />' After the monitoring wells have been properly developed, samples will be <br /> collected from each well and analyzed for the following <br />' • TPHg (EPA Method 8015) <br /> • BTEX (EPA Method 8020) <br /> • MTBE (EPA Method 8020) <br />' • TPHd (EPA Method 8015 modified) <br /> • TOG (EPA Method 413 1) <br />' (If lead is detected in soil samples during this phase of work, subsequent <br /> groundwater samples may be analyzed for dissolved lead to confirm the <br /> presence of lead in groundwater beneath the site ) <br /> I2 b Characterization of Investigation-Derived Waste <br />' Soil and water generated during the drilling and purging of the three <br /> monitoring wells will be placed in drums onsite until analytical results have <br /> been received The soil and water will be disposed of at an appropriate <br /> facility, the method of disposal will depend upon chemical concentrations <br /> detected in the waste <br /> I <br /> I <br /> I <br /> C-178 WP 4/97 6 <br />