Laserfiche WebLink
CLEARWATER <br /> C a o u r <br /> Environmental Services <br /> ATTACHMENTS <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Groundwater Elevation Contour Map— 12/1603 <br /> Figure 4 Dissolved-Phase Gasoline Distribution Map (Groundwater)— 12/16/03 <br /> Figure 5 Dissolved-Phase Benzene Distribution Map (Groundwater)— 12/16/03 <br /> Figure 6A Empirical First Order Decay MW-1 TPHg and Benzene vs Time <br /> Figure 6B Empirical First Order Decay MW-4 TPHg and Benzene vs Time <br /> Figure 6C Empirical First Order Decay MW-5B TPHg and Benzene vs Time <br /> Figure 6D Empirical First Order Decay MW-8 TPHg and Benzene vs Time <br /> Table 1 Groundwater Elevations and Sample Analytical Results <br /> Table 2 Intrinsic Bioremediation Data <br /> Table 3 Well Construction Data <br /> Appendix A Groundwater Monitoring and Sampling Procedures & Natural Attenuation <br /> Processes and Recommended Monitoring Guidelines <br /> Appendix B Laboratory Analytical Reports Including Chain of Custody Records <br /> Appendix C CytoCulture Laboratory Report for Intrinsic Bioremediation Site <br /> Conditions <br /> • <br /> ZB178C/4QQ03 Monitoring Rpt 15 January 29,2004 <br />