Laserfiche WebLink
CLEARWA" TER <br /> G R O U P I N C <br /> Env-a nm en ta! Seraects <br /> Proposed Schedule <br /> Upon receipt of workplan approval from the SJCPHS/EHD,Clearwater will assist Barnes Trucking is obtaining cost pre- <br /> approval of these tasks from the Underground Storage Tank Clean-up Fund It is anticipated that cost pre-approval may <br /> take up to 30 days Following receipt of cost pre-approval,Clearwater will begin permitting for the drilling activities <br /> Certification <br /> This workplan was prepared under the supervision of a professional Registered Geologist in the state of California All <br /> statements, conclusions and recommendations are based solely upon published results from previous consultants, field <br /> observations by Clearwater Group, Inc and laboratory analysis performed by a California DHS-certified laboratory <br /> related to the work performed by Clearwater Group,Inc <br /> Information and interpretation presented herein are for the sole use of the client and regulating agency The information <br /> and interpretation contained in this document should not be relied upon by a third party <br /> The service provided by Clearwater Group, Inc has been conducted in a manner consistent with the level of care and skill <br /> ordinarily exercised by members of our profession currently practicing under similar conditions in the area of the site No <br /> other warranty, expressed or implied, is made <br /> Sincerely, <br /> Clearwater Group, Inc. AL giSD G <br /> 1 <br /> Prepared by Reviewed by Cc OM. <br /> " ! No. 6545 Z —4 <br /> r <br /> Scott FernX 19 Lq <br /> man Brian Gwinn R`�~ <br /> Project Scientist Senior Geologist <br /> Attachments Figure 1 -Site Location Map <br /> Figure 2- Site Plan and Proposed Soil Boring Locations <br /> Figure 3-Proposed Well Construction Detail <br /> Clearwater Field Protocols <br /> cc Mr Floyd Barnes,Barnes Trucking <br /> Ms Elizabeth Thayer,CVRWQCB <br /> I <br /> I <br /> Ms Lon Duncan 6 November 9 1999 <br />