My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002484
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1817
>
2900 - Site Mitigation Program
>
PR0540859
>
ARCHIVED REPORTS_XR0002484
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 3:48:14 PM
Creation date
1/15/2020 3:07:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002484
RECORD_ID
PR0540859
PE
2960
FACILITY_ID
FA0023361
FACILITY_NAME
PLAY N PARK (FORMER BARNES TRUCKING)
STREET_NUMBER
1817
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
1817 S FRESNO AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWA" TER <br /> G R O U P I N C <br /> Env-a nm en ta! Seraects <br /> Proposed Schedule <br /> Upon receipt of workplan approval from the SJCPHS/EHD,Clearwater will assist Barnes Trucking is obtaining cost pre- <br /> approval of these tasks from the Underground Storage Tank Clean-up Fund It is anticipated that cost pre-approval may <br /> take up to 30 days Following receipt of cost pre-approval,Clearwater will begin permitting for the drilling activities <br /> Certification <br /> This workplan was prepared under the supervision of a professional Registered Geologist in the state of California All <br /> statements, conclusions and recommendations are based solely upon published results from previous consultants, field <br /> observations by Clearwater Group, Inc and laboratory analysis performed by a California DHS-certified laboratory <br /> related to the work performed by Clearwater Group,Inc <br /> Information and interpretation presented herein are for the sole use of the client and regulating agency The information <br /> and interpretation contained in this document should not be relied upon by a third party <br /> The service provided by Clearwater Group, Inc has been conducted in a manner consistent with the level of care and skill <br /> ordinarily exercised by members of our profession currently practicing under similar conditions in the area of the site No <br /> other warranty, expressed or implied, is made <br /> Sincerely, <br /> Clearwater Group, Inc. AL giSD G <br /> 1 <br /> Prepared by Reviewed by Cc OM. <br /> " ! No. 6545 Z —4 <br /> r <br /> Scott FernX 19 Lq <br /> man Brian Gwinn R`�~ <br /> Project Scientist Senior Geologist <br /> Attachments Figure 1 -Site Location Map <br /> Figure 2- Site Plan and Proposed Soil Boring Locations <br /> Figure 3-Proposed Well Construction Detail <br /> Clearwater Field Protocols <br /> cc Mr Floyd Barnes,Barnes Trucking <br /> Ms Elizabeth Thayer,CVRWQCB <br /> I <br /> I <br /> Ms Lon Duncan 6 November 9 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.