Laserfiche WebLink
A21h. Ah <br /> Now NEW <br /> Barnes Trucking Facility , <br /> i <br /> Driveway <br /> Overhead i � <br /> -- `� Utilities O <br /> Garage f P l011> <br /> I� <br /> SB-5 L Office ; <br /> a, MW-2 / <br /> C, (TPHg-56µg/ <br /> :T U MW-6 <br /> N <br /> (TPHg=2,300µg/L) <br /> SS-3 le <br /> m � MW-1 I <br /> S8-1 (TPHg=5,800 99/L) Driveway <br /> Concrete Pad <br /> MW-3 Concre <br /> ti (TPHg s 850µg/L) Pad rPrtg I aDOu {to be destroyed) PMW-7 <br /> o MW-5 <br /> U o MW-4 TPHg100„g�x PMW-5 <br /> (TPHg.94 jig/L) <br /> ai <br /> ai <br /> ® PMW-8 <br /> U <br /> I <br /> EXPLANATION <br /> Former UST Excavation <br /> ® Former Fuel Dispensers <br /> MW-1 & Monitoring well <br /> SB-2 • Soil Bonng <br /> Proposed Soil Boring <br /> o so Dao <br /> PMW-5& Proposed Monitonng Well iiiiiiiiiN <br /> MHg'94µg/L) Results of 9/21/99 sampling APPROXUAATE SCALE IN FEET <br /> SITE PLAN AND PROPOSED BORING&MONITORING CLEARWATER GROUP, INC. <br /> WELL LOCATIONS <br /> Barnes Trucking Facility Project No Figure Date FY ure <br /> 1817 South Fresno Avenue g <br /> Stockton, Cahforrua C-178 11/99 2 <br />