Laserfiche WebLink
TECHNICAL INFORMATION REQUIREMENTS Page 2 of 12 <br /> FOR A REPORT OF WASTE DISCHARGE <br /> have any questions about CEQA. Additional information about CEQA is also available at the following <br /> link: http://opr.ca.gov/m ceaa.php. <br /> What is Required for the ROWD Technical Report? <br /> Please note the following tips to expedite the ROWD review and waste discharge requirements <br /> development: <br /> • Providing the information in the same order as the list below will help to expedite the ROWD <br /> review. Staff will use this as a checklist. <br /> • If any of the information is missing or incomplete, the ROWD will be deemed incomplete and the <br /> process (and your project) will be delayed until all of the required information is submitted. You <br /> will be notified in writing of the ROWD status after it has been reviewed. If the ROWD is <br /> incomplete, we will specify the additional information that is required to complete the ROWD. <br /> • All numerical data presented in tables and calculations performed using spreadsheets should be <br /> provided in digital form (MS Excel compatible spreadsheet) as well as hard copy. <br /> • If some of the information listed below can be found in a previous technical report prepared by a <br /> registered professional, the ROWD can incorporate the report as an appendix, but the ROWD <br /> text must specify where in the report the required information can be found. However, if <br /> appended reports contain information that conflicts with the body of the ROWD, it may cause <br /> further delays. <br /> A. General Information <br /> 1. Is this a new/proposed or existing facility? <br /> 2. If this is an existing facility, is the discharge currently regulated under Waste Discharge <br /> Requirements (WDRs) issued by the Central Valley Water Board? <br /> a. If so, provide the WDRs order number. <br /> b. If not, provide the name of the local agency that issued the current permit. <br /> 3. Provide a copy of any other permits that reference or relate to the wastewater disposal <br /> system. This includes Use Permits and Surface Mining and Reclamation Act (SMARA) <br /> reclamation plans, etc. <br /> 4. Provide the following for the facility that generates the waste and the site where the waste is <br /> discharged: <br /> a. Street address (provide street name and distance from nearest cross street if there is no <br /> street number). <br /> b. The approximate latitude and longitude of the facility that generates the wastewater, <br /> wastewater treatment facilities, and wastewater land disposal areas. <br /> c. Township, Range, and Section. <br /> d. Assessor's parcel numbers. <br />