My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FURRY
>
11900
>
2900 - Site Mitigation Program
>
PR0516611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 4:25:13 PM
Creation date
1/15/2020 4:17:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516611
PE
2965
FACILITY_ID
FA0012706
FACILITY_NAME
BEAR CREEK WINERY
STREET_NUMBER
11900
Direction
N
STREET_NAME
FURRY
STREET_TYPE
RD
City
LODI
Zip
95240
APN
06116026
CURRENT_STATUS
01
SITE_LOCATION
11900 N FURRY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kurt Kautz - 2 - 30 April 2016 <br /> Bear Creek Winery <br /> Required Reports Due Date <br /> Pond Design Work Plan and Construction Quality and 1 April 2017 <br /> Assurance Plan <br /> Wastewater System Improvements Phase II Completion Report 1 February 2019 <br /> Effluent Reuse Plan At least 60 days prior to <br /> use of treated wastewater <br /> for other beneficial uses <br /> In addition to technical reports required by the WDRs, the WDRs include a Monitoring and <br /> Reporting Program (MRP), which specifies monitoring and reporting requirements for you to <br /> implement. Please review the MRP closely so that you may establish appropriate sampling <br /> schedules and reporting protocols. The required monitoring report submittal dates are in the <br /> table below. <br /> Required Monitoring Reports Due Date <br /> Monthly Monitoring Report 18t day of second month following the end of the <br /> reporting period (i.e. the January monthly report is <br /> due by 1 March <br /> Quarterly Monitoring Report Vt day of second month after the quarter <br /> .e. the January-March quarter is due by 1 Ma <br /> Annual Monitorin Re ort 1 Februaryof each year <br /> Please be advised that the monitoring reports must be submitted on time and complete. <br /> Monitoring reports must include all of the items described in the Reporting Section of the MRP. <br /> Monitoring reports must be accompanied by a completed Monitoring Report Transmittal Sheet <br /> (blank copy enclosed). The first monitoring report required under this Order is due on <br /> 1 July 2016 and is to cover the month of May 2016. The April 2016 monitoring report shall <br /> contain the information required in the previous WDRs Order 71-037. The Annual Monitoring <br /> Report is due on 1 February 2017, and is to cover the 2016 calendar year. <br /> Report Submittals <br /> All monitoring and technical reports should be converted to searchable Portable Document <br /> Format (PDF) and submitted electronically. Documents that are less than 50 MB should be <br /> emailed to: centralvallevsacramento(a)waterboards.ca.gov. <br /> To ensure that your submittal is routed to the appropriate staff person, the following inIformation <br /> should be included in the body of the email or any documentation submitted to the mailing <br /> address for this office: <br /> Facility Name: Bear Creek Winery, San Joaquin County <br /> Program: Non-15 Compliance Order: R5-2016-0031 CIWQS Place ID: 209017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.