Laserfiche WebLink
8 . If the project will use significant amounts of any of the <br /> following, estimate amount or note that a large amount will be <br /> consumed: <br /> a . water C. natural gas <br /> b. electricity ---� <br /> 9. Describe any dischar es into surface waters ( including intermit- <br /> tant streams ) <br /> 10. Will the project result in substantial ai emissions or <br /> deterioration of ambient air quality? XNO YES <br /> 11. Will there be objectionable odors? -XNO YES <br /> 12. Describe any alteration of air movements, moisture, or tem- <br /> perature, or any change in climate, either locally or <br /> regionally_ Al <br /> 13. Specify any hazardous materials w ich will require storage, <br /> disposal , or transportation 'V <br /> 14 . Describe any exposure of people to noise, hazardous materials or <br /> situations _N—•4, <br /> 15 . Describe any displacement of people as a result of the project <br /> 16 . Describe any congestion which might occur on roadways or at <br /> interchanges or intersections as a result of the project <br /> 14 dyw�L <br /> B. MITIGATION MEASURES <br /> If any environmental impacts were described in the previous section, <br /> list and describe measures proposed to minimize the impacts . (Attach <br /> additional pages, if necessary. Use the following format . ) <br /> 1. Im a t 1 0# Osed d/i'mis dK to;// Nor 4Mv-C <br /> _r4 iI'll c & <br /> Mitigation Measures <br /> -7- (9/85) <br />