Laserfiche WebLink
i� <br /> CONSTRUCTION COSTS FOR REMEDIAL <br /> ISTRICT <br /> SIOALTERNATIVES (cont.) <br /> TABLE 2: I1MA;ED CKTON UNIFIED SCHOOL <br /> ,.� F ;nIKLIN HIGH SCHOOL <br /> Hu 00890q, <br /> or <br /> Imp( and backfill clean soil 3,600 <br /> 240 cu. yd. 0 $15/cu. yd. 2,000 <br /> 1,500 <br /> Contractor mobilization and demobilization 2,500 <br /> Fencing <br /> Analytical costs (20 samples) 1 2,400 <br /> Cositingency 15°�D <br /> Subtotal <br /> - Aboveground Vapor Extraction System $500 <br /> Plastic sheeting $ 600 <br /> Unload and spreadoil <br /> 280 cu. yd. <br /> $ yd. <br /> Oil 1,300 <br /> Embed 3-In. PVC perforated pipe <br /> 500 ft. 0$2.5/ft. system <br /> Blower and vapor recovery Y <br /> 5 HP motor, 100 cfm pump, mis.eliminator, 8,000 <br /> two carbon canisters and ga.�iges 1,000 <br /> 5,000 <br /> Concrete pad. 5,000 <br /> Electrical panel and conduit <br /> errnit 1,000 <br /> Air emissions p MONO . <br /> Analytical costs (7 samples) $25,800 <br /> Contingency 15°,b <br /> Subtotal $15,000 <br /> -Workplan, specifications, closure report <br /> Engineering <br /> MOW00 <br /> ESTIMATED COST FOR ALTERNATIVE 3 <br /> (rounded to nearest thousand) <br />