My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GERTRUDE
>
300
>
3500 - Local Oversight Program
>
PR0545189
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 1:26:12 PM
Creation date
1/16/2020 12:08:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545189
PE
3528
FACILITY_ID
FA0005174
FACILITY_NAME
SUSD-FRANKLIN HIGH SCHOOL
STREET_NUMBER
300
Direction
N
STREET_NAME
GERTRUDE
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14331006
CURRENT_STATUS
02
SITE_LOCATION
300 N GERTRUDE AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATI. SrIT SAFETY PLAN <br /> Job Name: Franklin High School <br /> Job Location: 300 North Gertrude Avenue, Stockton, California <br /> Client Name: Mr.Butch Schmidt,Stockton Unified School District <br /> Project Number: 17292.0001 <br /> General Work Description: Installation of Monitoring Well <br /> SSP Prepared by: Drew Van Allen <br /> On-site Safety Officer: Tom Lutterman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all on- <br /> site employees, subcontractors, and visitors prior to entering the site. General safe work <br /> practices are identified in the ATC Associates Inc.'s Injury and Illness Prevention Manual and <br /> apply to all ATC work sites. <br /> The provisions set-forth in this SSP shall apply to ATC employees and any subcontractors <br /> wonting for ATC at the job site. All personnel working for ATC at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> imwase the safety requirements. ATC personnel may suspend work if unsafe working <br /> conditions are identified or observed,or unauthorized modifications to the safety provisions set- <br /> forth <br /> etforth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures,appropriate amendments to this SSP will be provided by the ATC project manager <br /> or supervisor,with the written approval of a ATC project safety officer or the ATC Health and <br /> Safety Director. <br /> PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.