Laserfiche WebLink
ATC srM sAnTV PLAN <br /> Physical Hazards <br /> 'R `:i::;:is2:�`v�:;:5:::}:%?"y:i��:'•:�'k �$:�.?"f.'`:::.r::'`j:;:;i:?;iyi:j:•'.v:•nvic'.{}i::n:;::i:i;.?ti;>:•i,:i:ii::>iiiii i:yiii;�':':+r'iii;:;L:'::titi i:•'.'.�?':i: <br /> v. <br /> Heavy Equipment(Noise&Physical All heavy equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title B,Subchapter 4, <br /> Construction Safety Orders. in addition,an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> All equipment operators and ground crews <br /> working In close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> PAGE <br />