Laserfiche WebLink
1. <br /> ATC SnT SAFETY PIAN <br /> On-site communications: 0 Radio ®Verbal 17 Hand Signals <br /> 0 Other <br /> Designate hand signals here: <br /> Off-site communications: 17 Radio ®Telephone <br /> 0 Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beainnina work activities <br /> MARK EVACUATION ROUTES) ON SITE MAP L7 CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective eauimvwM <br /> fi.e., aloves, coveralls) will be placed In a ff-oailon <br /> drum with soil cuttinas <br /> Location of Wash Water. Restroom on-site <br /> Location of Toilet. Restroom on-site <br /> Location of Drinking Water. ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP 0 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored <br /> on-site until appropriate disposal methods <br /> are determined. <br /> PAGE 11 <br />