My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 4:56:14 PM
Creation date
1/16/2020 4:04:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LARRY'S AUTO Page 1 of 2 <br /> GO GEOTRACKER HOME A----OJECTSIgEC03Ta RC LOGOUT <br /> Path LO CI.SUre Plan OPEN-REMEDIATION <br /> LARRY'S AUTO(70607700119)-MAP THIS SITE <br /> EeuJp OI�RMGHT A900-U <br /> 308 GRANT STN ACTIVITIES REPORT BAN"OUINOOLNTYLOP(LEAD)-CASE•:1122 <br /> STOCKTON CA 95202 CASEWORKER:VIKIM-ARTNY-SUpERNSOR:AORIENNE ELLSAESSER <br /> 170 <br /> SAN JOAQU N COUNTY PUBLIC VJEBPAGE CENTRAL VALLEY ROOCB(REGION 55)-PERVISUSE 9, CO <br /> CASENORI(ER:JAMES BARTON-SUPERMSOR:LORI CONOON <br /> AEl PRIWADLE CASE SUMMARY FOR THISBTE CUFCWme:1028,6285 CUF,,dmyASSI9nS :B CUFAmouMP•1d:3724533 <br /> THIS PROJECT WAS LAST MOdFIEO BY VI 'N R VON 11/1&20131:32:44PM-11I87ORY <br /> THIS SIZE MS SUBMITt,,,CUDKBESE TO OPEN A NEW W IDUN WITH THE SUBMITTALAPPROVAL PAGE FDR THS NTE <br /> Path to Closure Plan-FY 72/13 <br /> THIS VERSION IS FINAL AS OF 11MW013 PATH TO CLOSI F HISTORY TH TO OS E PLA <br /> IMPEDIMENT 1 <br /> General Criteria D:Free product has NOT been removed t.Ne maximum exbm practieeble �O Procatlurel Impediment-I�,F+p <br /> Step b Readva Impediment 1-Step 1:-DELETE STEP COMPLETION DATE <br /> Expansion of the pilot study involving in-situ air sparing to include deep sells W-2B and vs 5C where a <br /> yells during the sampling event on 09/19/2012, and <br /> AM <br /> sheen, net [tee protluct, was repotted in the CVD JEClEDD <br /> eoamae the <br /> anD AodnoxAL STEv <br /> IMPEDIMENT 2: <br /> General Criteria E:A conceptual site model that assesses the nature,extent,and mobility of the release C Procetlural Impediment-INFO <br /> has NOT been developed <br /> stop to Resolve Impediment 2-Step 1:-DELETE STEP COMPLETION DATE <br /> Submittal of a work plan to assess the stooldon hyd[ou[Wn contamination east of HN-5 and in the a[ee <br /> AMAL DAM <br /> vhem a 5,000-galion OST and a 300-gallon waste oil tank bad been removed in 1980. Fr <br /> 2282014.. <br /> Step to Resolve Impedimem 2-Step 2:-DELETE STEP COMPLETION DATE <br /> Implement the work plan to define the extent of the contaminant pima. GATE ACTUAL DATE <br /> _PROJECTED__&30rA14 r <br /> Step to Resolve Impediment 2-Step 3:-DELETE STEP COMPLETION DATE <br /> Submittal of a co ceptual sits model that includes the results from the investigation. PROJECTED DATE ACNAL DATE <br /> 10130/2014 I <br /> _._.. -.._. ADO ADDITIONAL STEP <br /> IMPEDIMENT 3: <br /> General Criteria F:Secondary source has NOT been removed to the extent practicable r Procedural Impediment-INF. <br /> Slap to Resdve Impediment 3-SteP 1:-DELETE STEP COMPLETION DATE <br /> evaluate [M1e results of the eve/IAS systems that began operating in April 2013 and aulmu[ the report of <br /> findings. .JEOTE TUALD <br /> 630"2014_ <br /> SW to Resolve Impediment 3-Slap 2:.DELETE STEP COMPLEnON DATE <br /> Continue site remediation to reduce contaminant mass and concentrations to acceptable risk levels. <br /> pROJECTEO DALE ACTUAL GATE <br /> _.. 123012016 �— <br /> ADD AOdTONAL STEP <br /> IMPEDIMENT 4: <br /> Med' -Soe ifc Criteria,Groundwater:The contaminant plume that exceeds water quality obJectivw is Ffl Procedural Impedment-)gEq <br /> ristii <br /> NOT stable or decreasing in areal extent,and does NOT meet all of the additional charactecs of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length(That Exceeds Water Quality Objectives):Unknown <br /> • Plume is Stable or Decreasing in AREAL Extent:Unknown <br /> • Free Product in Groundwater:Yes <br /> • Free Product Has Been Removed to the Maximum Extent Practicable:Unknown <br /> • For sites with free product,the Plume Has Been Stable or Decreasing for 6-Years(info):Unknown <br /> • For sites with free product owner Willing to Accept a Land Use Restriction(if required):Unknown <br /> Free Product Extends Offsite:Unknown <br /> • Benzene Concentration:2 3,000 pgll <br /> Step to Resolve Impediment 4-S 1:-DF E 5 P COMPLETION DATE <br /> Submittal of a work plan to assess the extent Of the petroleum hydrocarbon plume. <br /> PROJECTED GATE ACTUAL DATE <br /> 27&2014 �— <br /> Sip to Rud we lmpsdimem 4-Step 2:-DELETE STEP - COMPLETION DATE <br /> Implement the work plan to define the extent of the contaminant plume. PROJECTED DATE ACTUAL DATE <br /> 6!3012014.. I <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T... 11/18/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.