12 December 1995 <br /> AGE-NC Project No. 95-0184 <br /> Page 2 of 6 <br /> Five soil borings (B1 through 135) were driCed at the site by Geological Audit Services, Inc. from <br /> February 11 to 14, 1994. Borings B 1 through B4 were completed as groundwater monitoring wells <br /> MW-1 through MW-4, respectively. Free product was encountered in MW-4 and removed. TPH as <br /> gasoline and BTE&X were detected in each well; TPH as diesel was detected in MW-4. <br /> 3.0. SCOPE OF WORK <br /> Additional investigation is required to determine the lateral and vertical extent and hydrocarbon <br /> impacted soil and ground water at the site. Feasibility testing should also be performed to determine <br /> remedial options for the site. <br /> AGE proposes to drill ten soil borings at and near 308 North Grant Street. Borings will be drilled <br /> using a truck-mounted, drill rig equipped with hollow-stem augers. Five borings will be completed <br /> as vadose-zone wells(vapor extraction wells). Two borings will be completed as combination ground <br /> water monitoring/vadose-zone wells. Four borings will be completed as ground water monitoring <br /> wells. <br /> 3.1. DRILLING AND SAMPLING <br /> Impacted soil is present in the vicinity of tank A. Impacted soil was also encountered during the <br /> drilling of MW-2 beginning at a depth of 35 feet. VW-1 will be installed adjacent to tank A and VW-2 <br /> will be installed near MW-2 for use as a vadose-zone remediation wells. VW-3 will be installed east <br /> of tank A and drilled at a 30° angle towards the north. VW-4 will be installed south ofMW-1 and <br /> drilled at a 30° angle to the east. Both VW-3 and VW-4 will be drilled to determine the lateral extent <br /> of impacted soil and used for vadose-zone remediation. VW-5/MW-5 will be installed in the sidewalk <br /> northwest of tank A to investigate the extent of both impacted soil and ground water. <br /> Impacted soil was encountered in the entire depth ofMW-4 during drilling. VW-7 will be installed <br /> at the location of tank B for vadose remediation. VW-6/MW-6 will be installed north of tank B for <br /> both soil and ground water investigation. <br /> The lateral extent of impacted ground water has not been defined. MW-7 will be installed south of <br /> tank A(cross gradient) and west of tank B (up gradient). MW-8 will be installed down gradient of <br /> tank A, inside the building at 825 Miner. MW-9 will be installed down gradient of tank B, in the <br /> sidewalk at the east end o£825 Miner. MW-10 will be installed across Miner Avenue down gradient <br /> oftank B. <br />