Laserfiche WebLink
19 November 2004 <br /> AGE-NC Project No. 95-0184 <br /> Page 3 of 6 <br /> be surveyed by a state licensed surveyor.Procedures for well installation,development and surveying <br /> are presented in Sections 4.2. and 4.3.. <br /> 3.4. GROUND WATER EXTRACTION (PUMPING) TEST <br /> AGE proposes to utilize the newly-installed extraction well EW-1 to perform an 8-hour step draw- <br /> down pumping test and a 12-hour aquifer constant rate pumping test at the site to: 1) evaluate the <br /> general zones of capture (radii of influence) achievable during ground water extraction at the site, <br /> 2) obtain general aquifer characteristics such as hydraulic conductivity, storativity, transmissivity, <br /> and draw-down at a constant pumping rate,and 3)evaluate the feasibility of ground water extraction <br /> as a remedial alternative at the site. <br /> A constant ground water pumping rate for the 12-hour aquifer pumping test will be based on the <br /> results of the 8-hour pumping test and the availability of storage for the produced water.If it appears <br /> that steady state conditions have not been achieved at the end of the 12-hour test,the test period will <br /> be increased to 24 hours. <br /> During the 12-hour pump test,grab ground water samples will be taken from the effluent line during <br /> selected portions of the pump-test. The ground water samples will be collected into laboratory- <br /> supplied 40-milliliter(ml) volatile organic analysis (VOA) vials containing 0.5 ml of hydrochloric <br /> acid as preservative and into one-liter amber glass containers without a sample preservative. Care <br /> will be taken to ensure that visible air bubbles are not present in the vials after filling and capping. <br /> Following collection the samples will be appropriately labeled, placed on ice and kept in a cooler <br /> until delivered to a DHS-certified analytical laboratory for analysis. COC protocols will be used to <br /> document sample custody transfer from the field to the laboratory; a COC form will accompany the <br /> samples. All pumping test procedures are described in Section 4.4. 6 tO 34nta "4'e �.(_. <br /> cz-sr4°l1z:�w{A444-1 <br /> V* A Capt 4S�o�/ <br /> 3.5. PREPARATION OF REPORT OF FINDINGS q , <br /> Following extraction well installation and performance of the pumping test,a report will be prepared <br /> presenting the findings. The report will include a description of work performed and the results of. <br /> 1) soil sampling and analysis and 2)the pumping test. Conclusions and recommendations will also <br /> be included in the reports, if applicable. The report will be in a format acceptable to the EHD and <br /> the California Regional Water Qualaity Control Board(RWQCB), and will be reviewed and signed <br /> by a California Registered Geologist. <br /> Advanced GeoEnvironmental,Inc. <br />