My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012700
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT
>
308
>
2900 - Site Mitigation Program
>
PR0542014
>
ARCHIVED REPORTS_XR0012700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 6:26:24 PM
Creation date
1/16/2020 4:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012700
RECORD_ID
PR0542014
PE
2960
FACILITY_ID
FA0023306
FACILITY_NAME
LARRYS AUTO REPAIR
STREET_NUMBER
308
Direction
N
STREET_NAME
GRANT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
308 N GRANT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WaterWork <br /> Groundwater Sampling Protocol <br /> Prior to arriving at the sampling site, all sampling equipment <br /> will be washed with laboratory grade detergent, and rinsed twice <br /> with tap water, once with acetone, and once with deionized water. <br /> The sample washing procedure will be carried out on-site before <br /> sampling of other monitoring wells, in such cases where more than <br /> one monitoring well is to be sampled. <br /> Immediately prior to sampling, the depth to water (DTW) level in <br /> the well will be recorded. The thickness of product on top of <br /> the groundwater, if present, will be measured using an interface <br /> probe. The procedure for conducting these monitorings are <br /> presented in the Groundwater Monitoring Protocol attachment. <br /> If free product is detected, analysis of groundwater for <br /> dissolved product will be conducted after the free product has <br /> been removed from the well. If all free product cannot be <br /> removed, an interval specific sampling device will be utilized to <br /> u collect a sample from below the zone of free product. Before <br /> collecting at least two groundwater samples from each well, the <br /> wEll will be purged until indicator parameters (temperature; <br /> conductivity and pH) stabilize. This will entail the removal of <br /> at least four or more well casing volumes by bailing or pumping. <br /> The criteria for determining well casing volumes and storage of <br /> purged waste is discussed in the WaterWork Well Development <br /> Protocol Attachment. The indicator parameter measurements will <br /> be taken both before and after purging of each well casing <br /> volume. Once the well is purged and well water has stabilized, a <br /> sample will be collected after the water level approaches 80 <br /> , Y percent of its initial elevation. Where water level recovery is <br /> slow, the sample will be collected after stabilization is <br /> achieved and enough water is present to fill sample containers. <br /> Cross contamination from transferring pumps (or bailers) from <br /> well to well wia-1 be avoided_by'_utilizing _dedicated_ equipment. <br /> Where this is not feasible thorough cleaning of equipment will be <br /> performed between sampling rounds. Sampling will proceed from <br /> the least contaminated to the most contaminated well, if <br /> information is available before sample collection, or if it is <br /> indicated by field evidence. <br /> Groundwater samples will be collected with a Teflon bailer with <br /> - <br /> bottom emptying devices. Duplicate samples will be transferred <br /> to vials or containers that meet Regional Board specifications <br /> (Table 1). Groundwater from the⢠bailer will be transferred to <br /> the sample container by allowing the fluid to .flow slowly. along <br /> the sides of the vessel. All containers will be filled above the <br /> top of the opening to form a positive meniscus. No head space <br />
The URL can be used to link to this page
Your browser does not support the video tag.