Laserfiche WebLink
' 26 November 2002 <br /> AGE-NC Project No 95-0184 <br />' Page 5 of 5 <br /> " .3uly 2001 �kz�fluf03 <br />' AGE is preparing an addition to the original Work Plan Addendum -Febraa-iy2OU2 to advance the <br /> two remaining CPT borings to 200 feet bsg and install multilevel monitoring wells <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory Evaluations of the <br />' hydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> number of available data points (>i e ground water samples) and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,is made as to the professional <br />' interpretations, opinions and recommendations contained in this report <br /> 1 <br /> I <br /> I <br /> I <br /> s <br /> Advanced GeoE nviron mental,Inc <br /> r <br />