My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011773
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRAND CANAL
>
2233
>
2900 - Site Mitigation Program
>
PR0504944
>
ARCHIVED REPORTS_XR0011773
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 9:43:29 AM
Creation date
1/17/2020 8:56:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011773
RECORD_ID
PR0504944
PE
2950
FACILITY_ID
FA0006428
FACILITY_NAME
BRIDGES SPECIALTY CENTER, THE
STREET_NUMBER
2233
STREET_NAME
GRAND CANAL
STREET_TYPE
BLVD
City
STOCKTON
Zip
95219
APN
11011006
CURRENT_STATUS
02
SITE_LOCATION
2233 GRAND CANAL BLVD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br /> Additionally one boring in the center at the source will be drilled to a depth of 20 feet <br /> below the bottom of the elevator pit This hole will serve as the new piston shaft <br /> location, and is also the area we would expect the majority of saturation at depth. Upon <br /> completion of this center hole, approximately 300 to 500 gallons of groundwater will be <br /> pumped and disposed of offsite Upon completion of drilling each boring,that boring will <br /> be backfilled with a 3-sack cement mix slurry <br /> GROUNDWATER INVESTIGATION <br /> Upon completion of soil remediation inside the elevator pit area, three groundwater monitoring <br /> wells will be installed, as close to the elevator shaft as possible and situated to the south, <br /> northwest and east of the elevator piston location in order to ascertain residual groundwater <br /> contaminant levels and to establish groundwater gradient. <br /> Upon receipt of the analytical results outlining concentrations of hydraulic fluid in groundwater, <br /> CRC will evaluate solution methods for remediation or further evaluation, which may include: <br /> pump and treat system, or <br /> sparging (to enhance biodegradation) in conjunction with biodegradation modeling, or <br /> particle transport modeling and risk assessment. <br /> Please review this Workplan at your earliest convenience and provide us with your approval <br /> . and/or comments <br /> Yours truly, <br /> CRC ENV TAL RISK MANAGEMENT, INC <br /> Trevor Santochi TREVOR o SANTOCHi - <br /> NO 1591 �, Danfrd M Baker � <br /> Technical Director, CIFIED Senior Vice President <br /> �FERING <br /> 1r GEOLOGIST / <br /> Enclosures- <br /> Exp 4:�tY <br /> �l r <br /> 1) Map (Site Location) f OFF <br /> 2) Map (Proposed Monitoring Well Locations) <br /> 3) Map (Soil Remediation Plan) <br /> 4) Well Construction Typical <br /> 5) Elevator Shaft Section <br /> 6) Soil Boring Location Map <br /> 7) Section A-A' <br /> 8) Section B-B' <br /> CRC FavuenmaHu Risk Mut"MMML k[ PAm 11327-017.1 <br /> 8rnmi Pumm L P <br /> .:I3 Grand Caul BarMird <br /> Iw 1I 199 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.