dglii - <br /> � L Implement an Interim Ground Water Remediation <br /> Monitoring well Aw-3 and proposed recovery X4dal <br /> will be manually pumped out on a biweekly ( y) <br /> schedule for a period of 6 months. <br /> 5.0 SITE SAFETY PLP,2+i <br /> All field procedures <br /> an, <br /> willtbelines related te <br /> accordancewiththenduct of <br /> site <br /> the site investigationlen (SSP) to be developed in compliance with <br /> specific safety p <br /> applicable requirements of the California Department ofal <br /> Health Services (DHs) and the Federal and State occupation <br /> Health and Safety AdministrationresentedninCAppendix•C. <br /> A detailed site safety p <br /> lan is 6.4 IMPLEMENTATION SCHEDULE <br /> The site investigation work proposed herein will be completed <br /> and a report submitted within 70 days after receipt of <br /> written approval of the proposed scope of work for <br /> len appy site investigation/characterization. The <br /> supe <br /> schedule for completion of major activities or tasks is as <br /> follows: <br /> aff-ar work �28�� <br /> - Review data/hydrogeologic g <br /> assessment <br /> Soil. sampling/borings/well 20 <br /> installation 25 <br /> Well development/sampling 45 <br /> Laboratory analysis 60 <br /> - Data interpretation 70 <br /> Report preparation <br /> This schedule may be subject to revision dependingtimely <br /> wired on <br /> approval and information req <br /> to <br /> receipt of work plan <br /> complete the site investigation. Any changes to the <br /> schedule will be communicated in advance to the appropriate <br /> agencies and parties involved. <br /> 7.0 RESPONSIBLE PARTIES <br /> Responsible parties involved with the site investigation and <br /> installation of the monitoring wells: <br /> 7 <br />