My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012704
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0012704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:19:02 PM
Creation date
1/17/2020 10:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012704
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY PLAN <br /> 1.0 INTRODUCTION <br /> A Site Safety Plan (sSP) , designed to address safety <br /> provisions needed during the site investigation, will be <br /> ti <br /> implemented nnelrfromedirectlskindcontactl,res to inhalatione,corall <br /> onsite person <br /> ingestion of potentially hazardous materials that may be <br /> encountered at the site. The rtectestabliive shes personnel <br /> responsibilities, personal po <br /> decontamination procedures, and emergency action plans. <br /> Alton Geoscience will enter the property described above, <br /> conduct the proposed investigation <br /> and/oresr installationforthiofta <br /> monitoring system following, Pr <br /> ocedSSP. <br /> The SSP describes means for protecting all sanal insite njury perso <br /> from deleterious connnel <br /> tamination or p <br /> onsite ac As described below, Alton <br /> strive to meet all requirements promulgated <br /> conscience owillnsi ed <br /> conducting onsi <br /> by the California Department of d Safealth y Services <br /> and State Occupational Health and Safety <br /> (OSHA and Cal-OSHA) . <br /> 2.0 RESPONSIBILITIES OF KEY PERSONNEL <br /> All personnel onsite will have assigned responsibilities. <br /> The Project Geologist, assigned to supervise fieldwi work, <br /> will <br /> also serve as Site Safety Officer (SSO) . <br /> Thesure <br /> that all onsite personnel have received a copy of the SSP. <br /> All personnel will be required to document ;.heir full <br /> -the site. <br /> understandiwc}thfthathe <br /> SSPPwission t:, <br /> illobe moonnitored at all times by the <br /> Compliance <br /> SSO. Appropriate personal protective equipment, listed below <br /> in Subsection 3.3, will be available and utilized by all <br /> onsite personnel. Prior to beginning work, the SSO will <br /> conduct a training session to assure that all onsite <br /> personnel are aware of safe work practices and potential <br /> ety Data Sheets (MSD: ) will <br /> hazards at the site. MaterialS <br /> be made available to all personnel. <br /> All onsite employees will take reasonable precautions to <br /> avoid unforeseen hazards. Ater documenting site employefull be <br /> understanding of the SSP, each <br /> Responsible for strict adherence to all procedures describe <br /> herein. Any deviation obslovoeSwwillbberheldresponsible <br /> ill tsto <br /> and corrected. Onsite emp ' <br /> Perform only those tasks for which they believe they are <br />
The URL can be used to link to this page
Your browser does not support the video tag.