Laserfiche WebLink
s <br /> Prepare Work Plan and Acquire Necessary Permits <br /> Prepare and submit work plan to the regulatory <br /> agencies for their approval. All required permits <br /> will be obtained and field activities will be <br /> coordinated with the appropriate agencies. This <br /> will include locating underground utilities and <br /> interferences that may be encountered during <br /> drilling or field activities. <br /> Gk ") obtain Information on Artificial Conduits <br /> obtain information on sewer line, main and lateral <br /> locations, and any past dewatering activities at <br /> Lepr.ino Foods property. Also, obtain information <br /> on utility lines on East Grantline Road. Prepare <br /> a site plan showing all of the above information. <br /> Further Investigate Adsorbed-phase Hydrocarbon <br /> Constituents in Soil <br /> Drill an additional three to .four soil borings and <br /> collect soil samples in the vicinity of Monitoring <br /> We11 AW-6, to.further investigate absorbed-phase <br /> hydrocarbon constituents in soil.: Soil oamples <br /> will be collected at 5-foot intervals, terminating <br /> at the capillary fringe, in accordance with the <br /> standard procedures and requirements of the <br /> regulatory agencies. <br /> The location of the sampling points will be <br /> determined using the results of previous <br /> investigations and site history. Samples will be <br /> analyzed for total petroleum hydrocarbons as <br /> diesel (TPH-D) , total petroleum hydrocarbons as <br /> gasoline (TPH-G) with benzene, toluene, <br /> ethylbenzene, and xylenes (BTEX) distinction„ <br /> Soil borings will be completely backfilled with <br /> either neat cement or an appropriate cement/sand <br /> slurry to the grade after collection of soil <br /> samples. <br /> An underground utilities survey may be roquired to <br /> verify/confirm the location of underground <br /> utilities and interferences before drilling. <br /> mask 1.4 . Install Additional Ground Water Recovery Well. <br /> Install one additional ground water recovery well <br /> in the immediate-vicinity-of-Soil Boring-B-7.- - _ -- - <br /> This well will be drilled using a truck-mounted <br /> CME 55 or 75 drilling rig with 12-inch-diameter, <br /> 4 <br /> SII <br /> J <br />