Laserfiche WebLink
SOIL SAMPLE HANDLING <br /> Soil sample handling follows the same bask protocol for both drilling and excavation activities. <br /> Upon retrieval, soil samples are immediately removed from the sampler, sealed with Teflon <br /> sheeting and polyurethane caps, and wrapped with tape. Each sample is labeled with the project <br /> number, boring/well number, sample depth, geologist's initials, and date of collection. After <br /> the samples have been labeled and documented in the chain of custody record, they are placed <br /> in a cooler with ice at approximately 4 degrees Celsius (°C) prior to and during transport to a <br /> state-certified laboratory for analysis. Samples not selected for immediate analysis may be <br /> transported in a cooler with ice and archived in a frostless refrigerator at approximately 4°C for <br /> possible future testing. <br /> MONITORING WELL INSTALLATION <br /> Monitoring wells are constructed of 4-inch-diameter, flush-threaded Schedule 40 PVC blank and <br /> screened (0.010-inch slot size) casing. The screened interval will typically extend at least 5 feet <br /> above, and 10 to 20 feet below, the top of the ground water table. The annular space <br /> surrounding the screened casing is backfilled with No. 2/16 Monterey sand (filter pack) to <br /> approximately 2 feet above the top of the screened section. <br /> During well construction, the filter pack is completed by surging with a rig-mounted surge <br /> block. A bentonite annular seal is placed above the filter pack. The remaining annular space <br /> is grouted with neat cement and/or bentonite grout to the surface. Utility access boxes are <br /> installed slightly above grade. Locking, watertight caps are installed to prevent unauthorized <br /> access to the well, and limit infiltration of surface fluids. <br /> FLUID LEVEL MONITORING <br /> Fluid levels are monitored in the wells using an electronic interface probe with conductance <br /> sensors. The presence of liquid-phase hydrocarbons is verified using a hydrocarbon-reactive <br /> paste. The depth to liquid-phase hydrocarbons and water is measured relative to the well box <br /> top or top of casing. Well box or casing elevations are surveyed to within 0.02 foot relative to <br /> a county or city bench mark. <br /> GROUND WATER PURGING AND SAMPLING <br /> Ground water monitoring wells are purged and sampled in accordance with standard regulatory <br /> protocol. Typically, monitoring wells that contain no liquid-phase hydrocarbons are purged of <br /> ground water prior to sampling so that fluids sampled are representative of fluids within the <br /> formation. Temperature, pH, and specific conductance are typically measured after each well <br /> rasing volume has been removed. Purging is considered complete when these parameters vary <br /> less than 10% from the previous readings, or when three casing volumes of fluid have been <br /> removed. Samples are collected without further purging if the well does not recharge within <br /> 2 hours to 80% of its volume before purging. <br /> GENFLD.1:6r17/93 A-2 <br /> i <br />