Laserfiche WebLink
Quarterly Progress Report, April Through June 1995 <br /> Former Mobil Bulk Plant 04-343 <br /> May 19, 1995 <br /> If you have any questions regarding this report, please call us at (510) 606-9150. <br /> Sincerely, <br /> ALTON GEOSCIENCE <br /> Ailsa S. Le May <br /> Geologist �\S�E�rL. G-oe <br /> II�� f �` •R n <br /> Matthew W. Katen, RG No. 157 <br /> Senior Geologist <br /> Attachments ale <br /> 30-0136/04343Rt0.QPM fi C Atk <br /> The ongoing project services summarized in this report have been conducted in accordance with current practice and the <br /> standard of care exercised by geologists and engineers performing similar tasks in this area. No warranty, express or <br /> implied,is made regarding the findings and professional opinions presented in this report. The findings are based solely <br /> upon an analysis of the observed conditions. If actual conditions differ from those described in this report, our office <br /> should be notified. <br /> • 2 <br />