My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011586
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
ARCHIVED REPORTS_XR0011586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 1:19:16 PM
Creation date
1/17/2020 11:48:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011586
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The above cost estimates are for the simplest air-sparging application with the lowest costs.these costs j <br /> increase substantially in other situations. For instance,ff soil vapor extraction must be added to the system, <br /> the first year cost more than doubles,to about$175,000.SVE also raises the annual operation, <br /> maintenance and monitoring cost substantially(from$20,000 per year to 570,000). <br /> In some cases, people are using air-sparging to treat the plume and the source. Even if the plume is very <br /> small and the additional area to be sparged is small,the cost of installation escalates by about 50% and <br /> annual operating expenses double to $ 0,000 per year. If SVE must be added to such a system (as most <br /> engineers would probably recommend),first-year installation and operating costs will typically run$200,000 <br /> to $300,000. In the following years'operation, maintenance and monitoring costs will be about$90,000 per <br /> year.The advantage of such a system is that if it is successful,the duration of treatment would be less. <br /> i <br /> C-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.