Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared. 12/17/2019 <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed. 1) monitoring system control panels, 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,"4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping, 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser ent; 10) <br /> line leak detectors,and 11)devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan V town SOOT <br /> Sba Addrasa: CIT Y GAS&LICCUOR 78+70 CAMBR DGE RD LATHOR CA 2�2� <br /> . . . . _ . . - - - - - - - - . . . T �t-1�AI- H <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . .� ; : ONNjEN <br /> . . . . . . . . . . . . . . . �Ft) Rav NVT. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S x���� x F . . . <br /> . . . . . A <br /> t" B``J 87 B <br /> S P x F X F . . . <br /> . t x B E B A . <br /> *PIPING* DSL 91 <br /> (ARROWS) . • . <br /> Draming of . . . . . - - . . . . . . . . . . <br /> KEY <br /> piping eAtof - - • . . . . . - . . . A=xNNU AK Sensor <br /> sump and UDC's. . . . . . . . . - F=FILLS <br /> No underExound _\ArOR <br /> dialring is <br /> . . . . . . . . . . . - p=PROBE <br /> accurate,n-e - . . . - - - . . - - L=TurbineLea&-Detector <br /> cannot specuIzze <br /> blue print. . . . . . . . . . . . . . . - - - - X=SL3SP SENSOR <br /> B=Brine S <br /> . . . <br /> . . . . . . . . . . <br /> . <br /> 5=Smart Sensens r <br /> Sensor <br /> C=Floats 6a Cbaius <br /> E=E Stop <br /> .pirollen:e.rwe autrJ'oLprngroorr.soerir;h.-ernr sm><we rerc:adeJ+ a-ou,{Oorr,merr.+u7o^mtrri;ptnxyle►xrrcnanLDorm�eia7ra <br /> rar ro:cde <br /> Date map waa drawn: <br /> Instructions <br /> If you a:ready have a diagram that sho+,.s all regjired irformattn,you may include a,rather than chs cage,wih your Monitor:ng System Certification. On your site plan, <br /> shovr the general tayout of tanks and piping. CL-arty identify locations of the following equiprre-t,d irstalled:rranitc Tng system control panels sersor monitoring tank <br /> annularspaces.sumps,dispenser pans.spill oontaine+s,or o&.er secondary ocnminment areas:mechanica�or electronic'.ire leak•j.ectors:ac."in-tank liquid levet <br /> rcct:es fif used for leak detection). In the space provided,note the date this Site Plan was prepare'. <br /> LEGEND <br />