My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
2300 - Underground Storage Tank Program
>
PR0231906
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2021 4:04:16 PM
Creation date
1/17/2020 11:55:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231906
PE
2361
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
01
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM <br /> III. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N N/A <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats ® ❑ ❑ <br /> move freely,functionality tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not ® ❑ ❑ <br /> interfere with their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionality tested,and confirmed operational? ® ❑ <br /> Does the flow if fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or ® ❑ ❑ <br /> is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down?(Check all that apply) ® sump ® Under-Dispenser <br /> Containment <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IV. COMMENTS <br /> V. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed.(Do not complete this section) Y N N/A <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, ❑ ❑ ❑ <br /> including testing for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue build up to ensure that floats move ❑ ❑ ❑ <br /> freely,functionally tested,and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? El 1 El <br /> For any answer of"N'above,describe In Section X1 how and when these deficiencies were or will be corrected. <br /> VI. COMMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.