Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT <br /> V. TANK SECONDARY CONTAINMENT INFORMATION (ANNULAR) <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer. <br /> A® B ® C❑ D❑ <br /> A❑ 77�- B C❑ D❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ® Industry Code or Engineering Standard: PEI/RP1200/Vacuum Test/10Hg for 1 hr. <br /> ❑ Engineered Method: <br /> Attach the testing procedures and all documents required to determine the results. #of Attached Pages: <br /> Tank Containment Testing Training and Certifications Expiration Date <br /> ICC Service Technician—Jeff Raven 9326216 8/31/2021 <br /> VI. COMMENTS <br /> Tested 87 and DSL annular after bucket replacement per county requirements. <br /> VI1. PRODUCT PIPING CONTAINMENT TESTING INFORMATION (SECONDARY LINE) <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A❑ B❑ C❑ D❑ <br /> A❑ B ❑ C D❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ® Industry Code or Engineering Standard: PEI/RP1200/Pressure Test/5 psi for 1 HR <br /> ❑ Engineered Method: <br /> Attach the testing procedures and all documentation required to determine the results #of Attached Pages: <br /> Product Piping Containment Testing Training and Certifications Expiration Date <br /> ICC Service Technician- <br /> Interstitial Communication Verification Method Used: <br /> VIII. COMMENTS <br /> N/A <br />