My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 8:17:39 AM
Creation date
1/17/2020 11:56:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S\VIZCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developcd B3 : Piping Manufacturer X Industry Standard I Professional Engineer <br /> Other(Specify) <br /> 'rest Method Used: x Pressure I Vacuum I Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Analog Pressure Gauge Equipment Resolution: +/_0.25 <br /> Piping 12un " DSL RV Piping Run # Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 2" <br /> Length of Piping Run: 200' <br /> Product Stored: Diesel <br /> Method and location of Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES ppR 0 /t02 <br /> starting test: <br /> rest Start Time: 10:00 AM_ TH <br /> Initial Reading(Rr): 5.00 Psi ,WSVlvloNm <br /> Test End Time: 11:00 AM ©E <br /> Final Reading(RF): 5.00 Psi <br /> Test Duration: 1 Hour <br /> Change in Reading(R,:-R,): 0.00 Psi <br /> Pass Fail Threshold or 0.00 Psi <br /> (riteria: <br /> Test Result: ® Pass ❑ Fail E Pass ❑ Fail C Pass ❑ Fail 1 ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.