Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br /> XVI. LINE LEAK DETECTOR TESTING <br /> r Check this box if line leak detectors(LLD) are NOT installed. (Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? r- (- <br /> (Check all that apply.)Simulated leak rate verified: r 3 GPH (` 1.1 GPH r 0.2 GPH <br /> Was the testing apparatus properly calibrated? r r r <br /> For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? r r r <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? r r W <br /> For electronic LLDs, does the turbine automatically shut off when a leak is detected? I✓ r r <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? r r r <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? I✓ r r <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? fV r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed? I✓ r r <br /> Were all LLDs confirmed operational within regulatory requirements? r r r <br /> For any answer of"N"above, describe in section XIII how and when these issues were or will be corrected. <br /> XIII. COMMENTS <br /> XIV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> r Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) r Vacuum r Pressure r Hydrostatic <br /> Sensor ID Component(s) Monitored by this Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> r Pass r Fail r Pass r Fail <br /> F-Pass r Fail r Pass r Fail <br /> F-Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> I-Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> F-Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> How was interstitial communication verified? r Simulated leak at far ends of the interstitial space. r— Inspection <br /> r Other(Describe the method in section XV below.) r Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason in section XV below.) <br /> For any answer of'W"above, describe in section Xlll how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH =Gallons per hour, Y=Yes, N = No, NA= Not applicable,VPH =Vacuum/Pressure/Hydrostatic, ID=Identification <br />