My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:42:41 PM
Creation date
1/17/2020 12:05:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 (2) � <br /> A-A 4" OVER 3" DOUBLE 36 MACOVOER C <br /> WALL FIBERGLASS Ln r <br /> VAPOR PIPING TU PBUIMP LID ° a 1.0 <br /> a <br /> a <br /> 3" SUMP ENTRY/DW d a a a s n <br /> TERMINATION FITTING ° a N <br /> W/ TEST PORT ° a <br /> a <br /> 3" OVER 2" DOUBLE WALL. <br /> Z X Q <br /> FIBERGLASS VENT PIPING 3" EZ-- FIT x FRP <br /> O <br /> ADAPTOR (INSTALL W/ N oo <br /> 2" SUMP ENTRY/DW EZ-FIT PLATE FOR DIESEL) I <br /> JUNCTION BOX <br /> TERMINATION FITTING PEA ° <br /> W/ TEST PORT & I 3/4" CONDUIT TO (EXPLOSION PROOF) GRAVEL co <br /> 2" EZ x FRP ADAPTOR FILL ANNULAR SPACE ° _ co <br /> 1" CONDUIT TO o Lo <br /> MONITOR JUNCTION BOX SINGLE WALL U -'j- <br /> 3"x <br /> 3"x 18" EZ-FIT / INTRINSICALLY SAFE TANK SUMP Q <br /> F � � GUTTER AT MONITOR yV Z_LEXIBLE CONNECTOR Q <br /> B-B (OMIT FOR DIESEL) ® B-B CONTROL PANEL SINGLE WALL ACCESSIBLE FROMGRADE) cin V <br /> ' <br /> TANK SUMP o <br /> _ - - - - - 3/4" CONDUIT TO I 00 o <br /> ELECT. PANEL <br /> OF TANK �> <br /> 48 0 F.R.P. CONTAINMENT (TURBINE POWER) I <br /> SUMP WITH REDUCING \ 3" ADAPTOR, 2" FLEXIBLE <br /> LID DOUBLE WALL \ C / EZ-FIT x MNPT SEAL OFF & I HOSE. EZ FIT <br /> (INSTALL 3" 3/4" EXPLOSION <br /> 2"x 24" EZ-FIT PLUG FOR DIESEL) PROOF 90' ELBOW I 3" OVER 2" DOUBLE <br /> FLEXIBLE CONNECTOR / I 3" PVC OR FRP PIP WALL FIBERGLASS <br /> \ / 4" x 3" x 2" OPEN AT BOTTOM. PRODUCT PIPING <br /> 36" MULTiPORT EXTRACTOR FITTING <br /> ATTACH TO STEEL RISER <br /> MANHOLE I W/ UNISTRUT FOR SUPPORT <br /> 2" ADAPTOR <br /> 2" 90' EZ-FIT EZ-FIT x MNPT <br /> ELBOW (TYP.2) 4 <br /> f� <br /> bl"-A-A I I 2" SUMP ENTRY / <br /> TERMINATION FITTING <br /> W/ TEST PORT AND <br /> NOTE: AS PER CCR TITLE 23, DIVISION 3, CHAPTER PLAN I LIQUID 2" EZ FRP ADAPTOR <br /> 16, ARTICLES 1-11 SUBSECTION 2635, SPILL SENSOR <br /> CONTAINERS SHALL COLLECT HAZARDOUS z <br /> 0 <br /> SUBSTANCES SPILLED DURING PRODUCT DELIVERY <br /> AND MEET ALL REQUIREMENTS, TANK FUELING SYSTEM SECTION B-B SECTION A-A <br /> SHALL ALSO PROVIDE POSITIVE SHUT-OFF OF FLOW TO w <br /> a <br /> THE TANK WHEN THE TANK IS FILLED NO MORE THAN 95% <br /> w <br /> V) <br /> cn <br /> IMPORTANT: <br /> TOP OF TURBINE, TOP OF <br /> FILTER, VACUUM MONITORING <br /> MANIFOLD & J-BOXES - DO NOT LOCATE NOTE: <br /> ALL TO BE WITHIN REACH PENETRATION FITTINGS ALL STEEL FITTINGS m <br /> FROM GRADE 12 18" ON DW SUMP JOINTS TO BE PRIMED <br /> a <br /> 0 <br /> FILL ADAPTOR 36" MULTI VAPOR RECOVERY <br /> AND CAP PORT MANHOLE ADAPTOR AND CAP <br /> z <br /> CRITICAL DIMENSION: SUMP <br /> PAVEMENT 8" MAX FROM TOP OF SHIELD C <br /> SUMP MARKERS ADAPTOR TO GRADE <br /> SHIELD 0 <br /> #4 @ 18" L <br /> O.C. EACH WAY o ° A-A <br /> 4 � q <br /> --may �' • A � � '"' D � �� � � � 4 <br /> Q <br /> • • a aIlk— <br /> a ' • • a Q• TU PUMP <br /> a P LLD <br /> SLAB EXTENDS BELOW {2} #6 0 12" O.C. <br /> TOP OF DW SUMP EACH SIDE OF MANHOLE 1 CONDUIT TO < �C <br /> INTRINSICALLY <br /> SAFE GUTTER AT \ <br /> NEW 5 GALLON OPW <br /> NEW 5-GALLON CONDUIT TO TANK MONITOR CONTROL 2" x 24" EZ-FIT <br /> FILL BUCKET ASSEMBLY BOPW VAPOR SPILL UCKET ASSEMBLY ANNULAR MONITOR PANEL (1 PER TANK) 1 FLEXIBLE CONNECTOR (TYP.) � <br /> O <br /> JUNCTION BOX <br /> r <br /> 4" RISER <br /> ADAPTER, PRIMED <br /> j SINGLE WALL CONTAINMENT OF TANK 2" EZ-FIT x 2" FRP z O <br /> j TANK SUMP SUMP W U <br /> 3/4" CONDUIT FOR \ 12 <br /> 4" 5CH40 <br /> STEEL COUPLING B-B PUMP POWER TO / \\ / B-B co � V) <br /> EL(1 PER TANK) <br /> 4" SCH, 40 STEEL <br /> RISER, PRIMED � � ._.--- 3" PVC PIPE LLJ U Ln <br /> NEW VEEDOR ROOT OPEN AT BOTTOM w � Z M <br /> 209 SENSOR Q <br /> 3" PVC OR FRP 2" FIBERGLASS z O U <br /> PIPE OPEN AT BOTTOM. PRODUCT PIPING <br /> ATTACH TO STEEL RISER A-A C� U <br /> W � N <br /> 0 Z <br /> C <br /> WITH UNISTRUT FOR SUPPORT 0- O <br /> W <br /> EXTRACTOR I� 3" OVER 2" DOUBLE 2" SUMP ENTRY/ ♦♦nn <br /> FITTING II WALL FIBERGLASS TERMINATION FITTING W/ vJ 0 U r CL <br /> PRODUCT PIPING TEST PORT & EZ x FRP <br /> GLUED ADAPTOR (TYP.) DRAWN BY: DG <br /> REVIEWED BY: EM <br /> II <br /> LIQUID PLAN VIEW <br /> SENSOR Ij DE <br /> LJ OBNO: 19400008.1 <br /> I� Il <br /> II PRODUCT 4 <br /> II FLOAT II <br /> NOTES: WATER <br /> 1. PERPENDICULAR PENETRATIONS FLOAT <br /> OF CONTAINMENT SUMPS REQUIRED. <br /> STEEL PLATE AT BOTTOM <br /> 2. USE SUMP PENETRATION FITTINGS TANK BOTTOM LOCKING NUT <br /> AT ALL PENETRATIONS OF SUMP. <br /> 3. ALL JUNCTION BOXES ARE TO BE <br /> PLACED WITHIN 1'-0" OF THE TOP OF `SECTION B-B <br /> SUMP. TYPICAL DIESEL SUMP DETAIL <br /> SHEET <br /> 4. USE PHIL-TITE RISER SUPPORT SECTION A-A <br /> BRACKETS (BRACELETS) <br /> F=3 <br /> TLM FI LL AND VENT 2 TURBINE SUMP DETAILS <br /> F-3 NOT TO SCALE F-3 NOT TO SCALE OF 4 SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.