My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:42:41 PM
Creation date
1/17/2020 12:05:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED JAN 15 LULD i C t W/o l �C <br /> SAN <br /> J i Environmental Health Department <br /> coo <br /> ' Underground Storage Tangy Program Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> CHEVRON STATION #210997 " (209) 599-0149 January 15, 2020 <br /> Facility Address: CERS ID: <br /> 1442 Colony Dr, RIPON , CA 95336 10184539 <br /> Inspection Contact: Title: Phone: <br /> Karina Gordillo Store Manager (209) 599 0149 <br /> Inspection Type Program: <br /> ROUTINE INSPECTION - Operating Permit 12361 - UST FACILITY <br /> Consent For. I Consent Given By : <br /> ® Inspection N Photos ❑ Samples I Karina Gordillo , Store Manager <br /> Service Technician Onsite: Exp. Date: Designated Operator: Exp. Date: <br /> Jarrod Cooke 04/03/2021 Eric Aranda 03/21 /2020 <br /> Service Technician Manufacturer's Training : <br /> VMI , 04/ 11 /21 ; OPW, 01 / 17/20 ; VR , 04/ 17/20 <br /> CCR = Title 23 California Code of Raguleltons HSC = Health and Safety Code CFR = Code of Federal Regulations <br /> V = Violation R = Repeal violation COS = Corrected on site during inspection <br /> File Review <br /> 101 HSC 25284; CCR Failed to obtain a permit to operate from the EHD including but not limited to unpaid permit fees o V o R o COS <br /> 2711 (d) <br /> 102 HSC 25284 (a)(3) (A)/(B) No written agreement between tank owner and tank operator to monitor the tank system o V ❑ R o COS <br /> 103 HSC 25292,21 25299,30 Failure to submit and maintain complete and current financial responsibility documents o V a R o COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current ❑ V o R o COS <br /> 105 CCR 2632(d)(1 )t Failed to have an approved UST monitoring plan a V ❑ R o COS <br /> 2634(d) <br /> 106 CCR 2632(d)(2) , Failed to have an approved UST response plan o V o R a COS <br /> 2634(e) <br /> 107 CCR 2632(d), 2641 (h), Plot plan/site map not submitted or failed to completely show where monitoring is performed ❑ V o R ❑ COS <br /> 2711 (a) <br /> 108 CCR 2637, 2638(e) , Failed to notify the EHD 48 hours prior to conducting testing o v OR a COS <br /> 2643(g) <br /> 109 CCR 2637(aA) , 2712 Failed to test secondary containment, or failed to maintain test records for 36 months o V OR ❑ COS <br /> 110 CCR 2637(e), 2637(1) Failed to submit "Secondary Containment Testing Report Form" within 30 days after the test o V o R ❑ COS <br /> 111 CCR 2638, 26410), Failed to test monitoring and leak detection equipment every 12 months o V ❑ R o COS <br /> 2715 (0 <br /> 112 HSC 25293 Failure to maintain UST records to enable the UPA to determine whether the UST is in compliance a V o R o COS <br /> 113 CCR 2638(c), 2638(d) Failure to submit "Monitoring System Certification Form" within 30 days of completion of the test o V a R o COS <br /> 114 CCR 2636(f)(3), 2643(c) No 0. 1 gph annual line integrity test for pressurized piping, or within 30 days after repair o V a R o COS <br /> (3) <br /> 115 CCR 2715(a)(1 )(B) , "Designated Underground Storage Tank Operator Identification Form" not submitted within 30 days o V a R o COS <br /> 2715(a)(3) <br /> 116 CCR 2715 Designated operator, service tech or installer did not possess current ICC certification o V o R o COS <br /> 117 CCR 26638 2712(b)(6) Failure to comply with tank lining, recordkeeping , and inspection requirements o V a R o COS <br /> 118 CCR 2715(a)(1 )(A), Failure to submit the "Underground Storage Tank Statement of Understanding and Compliance Form" o V o R ❑ COS <br /> 2715(a)(2) <br /> 119 HSC 25299(a)(8), Documents were falsified or misrepresented o V ❑ R o COS <br /> 25299(b)(7) <br /> 120 CCR 2635(d) Failed to submit UST Certification of Installation/Modification o V o R ❑ COS <br /> 121 CCR 2712(f) Failure to implement corrections and submit written response within 30 days of receiving the report a V ❑ R a COS <br /> FA0013918 PRO518458 SC001 01 /15/2020 <br /> i <br /> EHD 23-01 Rev, 91202019Page 1 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue ( Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjcehd . com <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.