My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 3:20:39 PM
Creation date
1/17/2020 2:14:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> x . <br /> 500 East Grant Line Road <br /> Chronology Page 508/04/97 , <br /> 12-04-92 PHS/EHD witnessed groundwater sampling of AW7 and AW4. <br /> 1993 <br /> 01-08-93 Sequoia Analytical concluded that the samples which did not normally contain diesel though which <br /> was reported to contain diesel, were reported positive because a series of isolated peaks were <br /> identified. i <br /> 01-28-93 PHS/EHD correspondence requested consideration for the use of Method 8270 to identify isolated <br /> peaks. <br /> 03-19-93 Alton correspondence included'a permit application. j <br /> 03-23-93 PHS/EHD received the"Risk Assessment Work Plan"dated March 22, 1993 by fax. Issued permit# <br /> 93-0476 for the installation of three on site monitoring wells AW10-AW 12. <br /> 03-25-93 PHS/EHD inspection of the installation of AW10-AW12. Finaled permit#93-0476. Contamination <br /> was noted. <br /> 04-02-93 PHS/EHD received the hard copy of the "Risk Assessment Work Plan". PHS/EHD performed a site <br /> inspection to witness groundwater monitoring. <br /> 04-08-93. PHS/EHD correspondence commented on the "Risk Assessment Work Plan" PHS/EHD stated that <br /> since groundwater quality .has already been impacted risk assessments based on health based <br /> methodology have limited',application. PHS/EHD requested that the proposed risk assessment and <br /> FRP be submitted by June 30, 1993. i <br /> I <br /> Office meeting with Jeff Scharff,Jan Greben and Greg Schubert representing Tracy Venture. <br /> 05-27-93 PHS/EHD performed a site inspection to witness groundwater sample collection and splits with <br /> Geomatrix. <br /> I <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.