Laserfiche WebLink
Page 1 of 2 ENCROACHMENT PERMIT PERMIT NO. <br /> CITY OF TRACY DATE OF ISSUANCE <br /> _ PERMIT VALID UP TO <br /> PROJECT COST <br /> INSPECTION DEPOSIT <br /> PERMIT FEB- - <br /> . <br /> ENGINEERING FESS <br /> TESTING <br /> PERFORS <br /> MANCEBOND <br /> TX <br /> THIS PERMIT IS HEREBY: ISSUED TO ENCROACH ON ,THE YVES T SIDE OF f;NrUIQE /LIAR K �' RO SFi <br /> FEET FROM FEWCA L� 'ff- FOR THE PURPOSE OF /L ti Z --wL 0.2/AiGS 70 20 <br /> NAME OF APPLICANT a 1 Ca t?o ADDRESS - 0D Wel f '�gD Si T®7- Z -P11ONEs <br /> Tar^. ,jeC9oS`o'?- Z9z <br /> APPROVED BY FIELD SUPERINTENDENTS <br /> CONTACT PHONE NUMBER: r1.0 <br /> CONDITIONS OF,_PERMIT <br /> 1. The Permittee shall notify the' Publie Works Department -,Inspection Division (63 -4420) forty-eight,'(48) hours <br /> prior to start of work pertaining hereto. V <br /> 2. '"'The Permittee.:agreee .to.perform work, under this permit, in accordance with- the prevailing City Standards, ^ � <br /> 1�,8pecifications''andi:ohall complywithall existing. codes and policies. <br /> . <br /> 3. Prmittee shall notify Police Ss, Fire Departments beforeistarting construction,of ,any :wo, <br /> rk. <br /> �s <br /> 4. Tentative starting- date OR- <br /> 5. Tentative completion date S � brt CITY INSPECTOR'S COMPLETION REPORT. <br /> the issue date this permit will. be void unless <br /> 6. If construction- ie'not started within 90 da a.'fro <br /> pe DATE OF CaMPLETION - <br /> otherwise stated' in the special conditions. CONCRETE <br /> 7. Contractors must display name and phone number atywork f ASPHALT <br /> site - preferablp on barricades. SIDEWALK <br /> 8. The cost of emergency work required to restored BACKFILL <br /> unsatisfactory construction that becomes a. hazard will w i 1 _ PAVING ' <br /> be charged to the Permittee... SIZE OF CUT <br /> 9. Replace full concrete sidewalk squares, as required, SQ'.SFT. INCHES <br /> by sawcutting along score marks. PAVED BY s- ` <br /> 10, Compaction teats shall be required on backfilled trenches <br /> at the expense of the Permittee (contact City Engineering COMMENTS: <br /> Department).' '.i" <br /> 11. Traffic control Shall be in;accordance with the: City <br /> Traffic manual. <br /> 12. Trenching and resurfacing is to comply with Standard <br /> Plan No. 501 and 501A. CLTX, INSPECTO1t <br />