My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
500
>
2900 - Site Mitigation Program
>
PR0503286
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 4:46:54 PM
Creation date
1/17/2020 2:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0503286
PE
2953
FACILITY_ID
FA0005766
FACILITY_NAME
MOBIL OIL BULK PLANT
STREET_NUMBER
500
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
500 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> ALTON <br /> GEOSCIENCE r� <br /> I THE RESULTS TEAM <br /> I <br /> — -J <br /> November 14, 1994 NOV 15 1994 <br /> 1 San Joaquin County Public Health Services ENVIRONMENTAL HEALTH <br /> 445 North San Joaquin Street PERMITISERVICES <br /> Stockton, California 95202 30-0136 <br /> t <br /> ATTN: MS. MARY WAYS <br /> SITE: FORMER MOBIL BULK PLANT 04-343 <br /> 500 EAST GRANT LINE ROAD <br /> TRACY, CALIFORNIA 95376 <br /> RE: SUPPLEMENTARY SITE ASSESSMENT WORKPLAN <br /> Dear Ms. Meays: <br /> On behalf of Mobil Oil Corporation, Alton Geoscience submits this supplementary site <br /> JI assessment workplan for former Mobil Bulk Plant 04-343 located at 500 East Grant Line Road <br /> '4 <br /> in Tracy, California (Figure 1). This workplan is being submitted in response to your letter of <br /> request dated September 9, 1994. Included for your review is the most recent quarterly <br /> monitoring and sampling report-for samples collected on October 6, 1994. <br /> In recent conversations with Mr. Steve Pao (Mobil) you relayed concerns regarding Alton <br /> Geoscience providing notification to your office prior to conducting ground water sampling at <br /> the above referenced site. In the past it has been our practice to verbally notify your office 24 <br /> hours prior to conducting the sampling event. In an effort to make this process more convenient <br /> for both of our offices, future notification will be sent in writing by fax approximately 48 hours <br /> prior to sampling at the site. In addition, per your request, field purge data sheets have been <br /> included in the enclosed quarterly report. All subsequent quarterly reports will also contain these <br /> data sheets. <br /> ri. If you have questions regarding this project, please contact us at (510) 606-9150. <br /> Sincerely, <br /> .. ALTON GEOSCIENCE <br /> r <br /> Kevin M. Keenan <br /> Senior Geologist <br /> Fnclosurn <br /> cc: Mr.Steve Pao,Mobil Oil Corporation <br /> Me.Elizabeth Thayer, RWQCIi <br /> Mr.Gordon Egan,Tracy Venture <br /> Mr.Greg Schubert,Tracy VentuxWMark lil <br /> 30A Lindbergh Avenue <br /> Livermore,California 94550 <br /> (510)606-9150•FAX(510)606-9260 <br />
The URL can be used to link to this page
Your browser does not support the video tag.