Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for NATIONAL PETROLEUM MANTECA as of December 16, <br /> 2020. <br /> Open violations from September 21, 2020 inspection <br /> Violation#104-Failed to have an approved UST monitoring plan. <br /> OBSERVATION: The monitoring plan is not current and/or not approved by the EHD. <br /> -Map does not clearly identify the B20 Biodiesel underground storage tank. <br /> REGULATION GUIDANCE: The monitoring plan must be uploaded to the California Environmental Reporting <br /> System (CERS). <br /> CORRECTIVE ACTION: Immediately log into CERS, make the necessary changes, and submit for review by the <br /> EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#115-Failure to submit"Monitoring System Certification Form"within 30 days of completion of <br /> the test. <br /> OBSERVATION:Annual monitoring system certification and leak detector testing was performed on 1/29/2020 and <br /> a test report was submitted on 7/20/2020, 5 months late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#116-Failure to submit the"Spill Container Testing Report Form"within 30 days after the test. <br /> OBSERVATION:Annual spill container testing was performed on 1/29/2020 and a test report was submitted on <br /> 7/20/2020, 5 months late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION: Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> Page 1 of 5 <br />