Laserfiche WebLink
4.6 SOIL AND GROUND WATER DISPOSAL <br /> Soil generated during drilling activities will be stored onsite in Department of Transportation <br /> (DOT) approved drums. Purged ground water will be stored onsite in DOT drums and later <br /> transported to an approved disposallrecycling facility. Waste manifests will be prepared for <br /> proper transport and disposal. f <br /> F <br /> 4.7 SUPPLEMENTARY SITE ASSESSMENT REPORT <br /> A report on the supplementary site assessment activities will include boring logs, laboratory <br /> analysis results, well construction details, findings, and conclusions. <br /> t <br /> 5.0 WORK SCHEDULE <br /> Planned activities will be performed according to the following estimated completion schedule: <br /> • Expected agency approval of work plan by: April 30, 1994 <br /> • Drill borings/install possible wells by: May 31, 1994 (pending private property access). <br /> • Submit supplementary site assessment report by: July 15, 1994 <br /> 6.0 SITE SAFETY PLAN <br /> ,a <br /> A site safety plan designed to promote project personnel safety and preparedness during the <br /> activities described in this work plans included in Appendix B. <br /> 7.0 LIST OF ATTACffiUENTS <br /> • Figure 1: Site Vicinity Map <br /> • Figure 2: Site Plan <br /> • Appendix A: General Field Procedures <br /> • Appendix B: Site Safety Plan <br /> 7 I <br /> 1 <br /> 5 <br /> C <br />