My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
0
>
2900 - Site Mitigation Program
>
PR0505070
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 5:16:15 PM
Creation date
1/17/2020 3:34:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505070
PE
2960
FACILITY_ID
FA0006510
FACILITY_NAME
CHEVRON PIPELINE
STREET_NUMBER
0
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
214-020-10
CURRENT_STATUS
01
SITE_LOCATION
GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMATR X <br /> Mr. Robert Mihalovich , <br /> Chevron Environmental Management Company <br /> July 12, 2001 <br /> Page 7 <br /> RWQCB approves the decommissioning of these two wells in 2001 in accordance with San <br /> Joaquin County and State of California requirements. <br /> We look forward to working with the RWQCB towards obtaining final resolution on this site. <br /> Please call either of the undersigned if you have questions. <br /> Sincerely yours, <br /> GEOMATRIX CONSULTANTS, INC. <br /> I <br /> Veen Chee Foong, PE M in B. Bloes <br /> Senior Engineer Se 'or Scientist <br /> VCF/MBB/pp <br /> I:\Doc_Safe\2000s\C2463\corralhollowresp 6nal.doc <br /> Attachments: Figure 1 Groundwater Elevations and BTEX Concentrations in Selected <br /> Wells I <br /> Figure 2 Declining Benzene Concentrations in Groundwater <br /> Figure 3 Groundwater Elevations and Analytical Results—May 2001 <br /> Groundwater Monitoring <br /> Table 1 Alternative 3: ORC (3 Change Outs per Year) <br /> Table 2 Alternative 3: ORC (1 Change Out per Year) <br /> Table 3 Conceptual ORC Pilot Study Cost Estimate <br /> I <br /> Appendix A ORC Replacement Calculations <br /> Appendix B Hydraulic Parameters at the Site <br /> i <br /> i <br /> I <br /> i <br /> II <br /> i <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.