My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GAWNE
>
16865
>
2900 - Site Mitigation Program
>
PR0505611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 5:37:09 PM
Creation date
1/17/2020 4:31:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505611
PE
2951
FACILITY_ID
FA0006807
FACILITY_NAME
MORESCO PROPERTY
STREET_NUMBER
16865
STREET_NAME
GAWNE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18309009
CURRENT_STATUS
01
SITE_LOCATION
16865 GAWNE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> Cjeofngicaf?ecfinics Inc. Page 3 <br /> McGranahan(Gawne Road) <br /> Cost Pre-Approval <br /> Project 251.3 <br /> June 12, 1997 <br /> 05/12/95 Submit Soil Boring.Installation Report <br /> 09/06/95 SJCPHSEHD request Additional Site Characterization Work Plan <br /> 10/13/95 Submit Additional Site Characterization Work Plan proposing (1) MW <br /> 10/19/95 SJCPHSEHD approve Additional Site Characterization Work Plan <br /> 12/20/95 Submit Addendum proposing VEW's to the 10/13/95 Work Plan <br /> 12/29/95 SJCPHSEHD request additional assessment <br /> 02/09/96 Submit Addendum#2 proposing additional borings and <br /> geotechnical testing to the 10/13/95 work plan <br /> 03/01/96 SJCPHSEHD approve 10/13/95 Work Plan w/modification <br /> 03/27/96 SJCPHSEHD request amendment to the 10/13/95 work plan <br /> 04/08/96 Submit Addendum#3 modifying geotechnical testing parameters <br /> to the 10/13/95 Work Plan <br /> 04/25/96 SJCPHSEHD approve 04/08/96 Addendum <br /> 06/17-18/96 Drill SB-5, SB-6, SB-7 <br /> 07/22/96 Submit addendum for geotechnical testing for archived sample <br /> 07/29/96 SJCPHSEHD approve testing archived sample <br /> 10/11/96 Submit Site Characterization Report <br /> 02/14/97 Submit Model Parameter Work Plan <br /> 03/21/97 Submit Fate & Transport Model Work Plan <br /> 04/08/97 Submit Interim Remedial Action Plan <br /> 04/11/97 Receive comments to the RAP <br /> 04/21/97 Submit Addendum to the RAP <br /> 05/06/97 Receive approval of the RAP & Addendum <br /> Proposed Direction of Project <br /> Mr. McGranahan is the Trustee in Bankruptcy for this property and needs to have this situation <br /> addressed as soon as possible. His goal is to start this work in July 1997 and have it completed <br /> by spring of 1998. Thereby reducing the risk these chemicals pose to the drinking water well <br /> located approximately 200 feet from the soil contamination plume. <br /> The site characterization report, remedial action plan and addendum are attached. Also the bid <br /> from the driller, electrician and correspondence from the Mr. Rowe. <br /> The supplemental fuel for the TO will be propane since there is not a natural gas supply to this <br /> property. The supplier for the propane will be J.S. West. This company has supplied propane <br /> for several other VETS projects run by GTI and have been found to be very cost effective and <br /> reliable. The per gallon charge is $0.66/gallon with no set up or delivery charges. To help <br /> reduce the cost of the fuel, they will set up two tanks and fill both of them during each delivery, <br /> thus reducing travel and overhead costs. <br /> Tentative Schedule for Implementing Work <br /> The proposed schedule for the additional site characterization work and feasibility study is as <br /> follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.