My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GAWNE
>
16865
>
2900 - Site Mitigation Program
>
PR0505611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 5:37:09 PM
Creation date
1/17/2020 4:31:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505611
PE
2951
FACILITY_ID
FA0006807
FACILITY_NAME
MORESCO PROPERTY
STREET_NUMBER
16865
STREET_NAME
GAWNE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18309009
CURRENT_STATUS
01
SITE_LOCATION
16865 GAWNE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geofogica(Tech*s Inc. <br /> 2741 9Ziver Xoad <br /> Modesto,Califamia 95351 <br /> (209)538-6424/jax#538-5852 <br /> Addendum to the October 13, 1995 <br /> Additional Site Characterization Work Plan <br /> Former Moresco Property <br /> .16865 Gawne Road <br /> Stockton, California <br /> Project No. 251.2 <br /> December 20, 1995 <br /> 1.0 INTRODUCTION . <br /> In planning the future course of action in preparing this site for'.remediation;.Mr. <br /> Mike McGranahan Trustee in Bankruptcy for the Former Moresco Property, has <br /> requested Geological Technics Inc. to maximize the cost effectiveness of the <br /> additional site characterization work by installing several vapor extraction wells and <br /> performing a vapor extraction pilot study to investigate the feasibility of <br /> remediation by vapor extraction. <br /> This addendum to the Geological Technics Inc. October 13, 1995 Additional Site <br /> Characterization Work Plan includes: <br /> • a site specific Health &Safety Plan (Attached in Appendix A), <br /> an investigative methods Quality Assurance Program (Attached in Appendix A), <br /> • identification of the licensed professional geologist responsible for the project- <br /> Raynold.I. Kablanow II,.Ph.D.,R.G. 5234 <br /> • identification of the licensed C57 drilling contractor chosen for the project-V&W <br /> Well Drilling of Rio Vista, C57# 710678, <br /> i . and the identification of the licensed analytical laboratory chosen for the project <br /> Sherwood Laboratory of Hilmar DHS# 1400. <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.