Laserfiche WebLink
: er Resources Contr +Board <br /> State V"t <br /> ,n z <br /> Division of Clean Water Programs ;, , t <br /> ,�,rrr.-�1.1�, <br /> 2014 T Street•Sacramento,California 95814•(916)227-4518 ,Gray Davis t <br /> Winston H.Hickox Mailing Address: 1'.O.Box 944212 Sacramento,California•—cwph me/ �gg <br /> Secretaryfor FAX(916)227-4530•IntemefAddress: http://www.swreb.ca.govhewphome/ustcf `fib � 9PN <br /> Governor <br /> Environmental <br /> Protection <br /> -t <br /> November 22, 1999 <br /> Michael D Mcgranahan, Administrator <br /> Louis Moresco,Jr. Liquidating.Trust. <br /> P O Box 5018 <br /> Modesto, CA 95352 ° <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 010323, <br /> SITE ADDRESS: 16865 GAWNE RD, STOCKTON,CA 95205 <br /> I have reviewed your request;received on N6vember,8; 1999,for ple- 'approvatof corrective action costs; <br /> I will place these in your file for future reference. I.have included a copy of-the"Cost Pre- <br /> this form in the future for requesting pre-approval of corrective <br /> Approval Request" form; please use <br /> actions costs.. <br /> With the following provisions,the total cost pre:approved as eligible for reimbursement for completing <br /> the June 7, 1949 Geological Technics,Inc.well abandonment <br /> w� 1an and September9,460; see the able below for a <br /> addendum approved by the San Joaquin County EHE) (County) s$ <br /> breakdown of costs. (The total amount approvedotherCounty isent t$r91 through number 7.0 for work at <br /> your site that has been directed and appy Y <br /> �r $e aware that this pre-approval does not constitute a d�caisionovreimbursement:County w'11 be el gibletfor1d <br /> necessary corrective action costs for work directed it PP <br />' Bement per the terms of your Letter of Commitment at costs consistent with those pre-approved in 7 <br /> reimbur p <br /> this letter. <br /> 14, YJ by Fund staff. <br /> All future costs for corrective action must be approved in writing <br /> Future costs foments of <br /> r corrective err`rou d Sn must t rag the <br /> Tank Rego ations. <br /> Article 11, Cltapter 16, Und g <br /> APPROVAL BREAKDOWN. <br /> COST PRE- Comments <br /> 1` roved <br /> Task 'Anount P're-Ap;p <br /> ' $0 Site closure plan and permitting <br /> already completed. <br /> 1.Project preparation pproved at <br /> $8760 Site supervisipre-aon is <br /> 2. Well abandonment&field logging <br /> $70/hr for 16 hours. � <br /> >, $600 <br /> 3. Site closure report <br /> $100 Only 1 hour is pre-approved. <br /> 4. Project Management g 911,111460 <br /> TOTAL PRE-APPROVED <br /> _ 1 <br /> California Environmental Protection Agency j <br /> j <br /> �a Recycled Paper <br /> 4 a <br />