My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GAWNE
>
16865
>
2900 - Site Mitigation Program
>
PR0505611
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2020 5:37:09 PM
Creation date
1/17/2020 4:31:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505611
PE
2951
FACILITY_ID
FA0006807
FACILITY_NAME
MORESCO PROPERTY
STREET_NUMBER
16865
STREET_NAME
GAWNE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
18309009
CURRENT_STATUS
01
SITE_LOCATION
16865 GAWNE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Geologica[Tec&eZrs -inc. +„ <br /> 3741 River Road <br /> M-iesu,Cufxfancia 95351 <br /> (209)538-6424/F¢r#538-5852 <br /> December 4, 1997 <br /> GTI Project No.: 2513 <br /> GTI Project Name: McGranahan(Gawne Rd.) <br /> ' A EALTH <br /> Ms. Diane Bufalacchi PERIOT SERVICES <br /> San Joaquin Valley Unified Air Pollution Control District <br /> 4230 Kiernan Road, Suite 130 <br /> Modesto, California 95356 <br /> RE: Authority To Construct(N-3946-1-0)Inspection Lab Test Results(11/12/97) <br /> Former Moresco Property, 16865 Gawne Rd., Stockton, CA 95352 <br /> Dear Ms. Bufalacchi: <br /> Herewith attached are copies of the laboratory data (Air Toxics LTD.) 'for the influent and <br /> effluent air samples collected during the initial inspection on: November 12, 1997 from the <br /> thermal oxidizer (TO) being used to control emissions from the soil vapor extraction system <br /> operating at the former Moresco Property site. The attached calculations show that the TO was <br /> effective in controlling emissions to permit conditions. At the time these samples were collected <br /> the extraction system was pulling from the air recharge wells. <br /> On November 16, 1997 the vapor extraction system was switched over to:the vapor extraction <br /> well. On November 19, 1997 samples were collected from; both the influent and effluent <br /> streams. Upon receipt of the results from the laboratory I will perform,the calculations and <br /> submit them to you. <br /> If you should have any questions regarding this project please contact myself or Ray Kablanow <br /> at the office. <br /> Respectfully Sub d, <br /> GrFOL00c'4� TEC�fNZCS 2NC. <br /> Michaeri.Niemi <br /> Geologist <br /> cc: Ron Rowe - SJC PHS/EHD <br /> Elizabeth Thayer- CRWQCB-CVR <br /> Mike McGranahan - Trustee <br /> USTCFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.